Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 12, 2024

91-24 Attachment - Neglia.pdf

Preserved file SHA-256d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acaf

Indexed text · page 71

Show all pages
Page 71

2 CIVIL ENGINEERING SERVICES A. Proposed roadway profiles matching existing grades; B. Roadway improvements include curb, sidewalk, aprons, pavement milling and resurfacing, pavement striping, new traffic signs, shade trees; Curb ramp plans and details as necessary; New drainage improvements as necessary; Drainage structure repairs with new frames, grates, curb pieces as necessary; New manhole castings, frames and covers as necessary. Repair existing manholes as necessary; Coordinate with WO Traffic Bureau for the preparation of traffic control and detour plans; Prepare construction details; Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, Traffic Control and Detour Plans, and Construction Details; Include one (1) meeting with Township Officials for Preliminary Design; Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; -zZromnmoga Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy and PDF files. The total length of each road is approximately: Morris Road 1,535 linear feet Sussex Road 585 linear feet Hunterdon Road 1,855 linear feet The total length of roads is approximately 3,975 LF. SCOPE OF WORK Topographic and Existing Condition Surveying Services Boundary survey is not included in the scope of services. Right-of-way will be shown from Township Tax Map and County GIS information. A. We will conduct a field survey for Morris Road, Sussex Road and Hunterdon Road within the project scope and all adjacent intersections. The project length for all three (3) roads is approximately 3,975 feet long. The survey will include the following: . Establishing of elevation benchmarks outside of the anticipated area of construction. Benchmarks will be placed at the beginning and end of project limit, and at least two in the GPI Scope of Services | Page 3

File revisions (1)