Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 12, 2024

91-24 Attachment - Neglia.pdf

Preserved file SHA-256d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acaf

Indexed text · page 76

Show all pages
Page 76

SECTION 2 Personnel Assignments For this project, GPI will perform the work in its entirety. No sub-consultants will be needed. All work will be done entirely within GPI’s Engineering and Surveying Departments. Michael E. Pirog, PE, Project Manager, will be responsible for the overall design, contract adherence, and overall project supervision. Mr. Pirog is quite familiar with the Township of West Orange, having worked on several other Township projects in recent years. He will be assisted by Engineering Department staff members Michael A. Wallo, PE, CME, Assistant Director of Engineering/Project Engineer and Lenin Cruz, Senior Designer. Quality Assurance-Quality Control (QAQC) will be performed by Andrew Cangiano, PE, CME, Director of Engineering - Morris Plains Office. GPI Personnel Assignments | Page 5

File revisions (1)