Supporting Documentation · Mar 12, 2024
91-24 Attachment - Neglia.pdf
d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acafIndexed text · page 93
Show all pagesASSOCIATES Zayibeth Carballo, Municipal Engineer February 13, 2024 Township of West Orange Our File No. 2024-037 Re: Professional Engineering & Surveying Services Page 3 2024 NJDOT Municipal Aid Program b. Prepare Construction Plans consisting of the following: 1. Cover Sheet Existing Conditions/Survey Control Plan Demolition Plan Construction Plans Grading and Utility plan ADA compliant curb ramp plans Pavement striping SSS Ss fo SS New traffic signs as necessary 9. Soil Erosion and Sediment Control Plans and Details 10. Reset drainage structures, manhole castings, frames and covers as necessary. 11. Construction Details c. Prepare contract documents and specifications required for public bid in accordance with the New Jersey Local Public Contracts Law. Detailed specifications will be provided for the items to be included in the contract. Twenty (20) sets of contract documents will be provided. d. Prepare a Construction Plan and Profile for the replacement of + 700 LF of 8” sanitary sewer main at Hunterdon Road from Tappan Terrace to Westover Terrace including all laterals servicing dwelling and utilities within limits along with construction details; and, e. Attend one (1) meeting with Township Officials for Preliminary Design. Summary of Fee Estimates We will provide the necessary engineering services as described above based upon the following lump sum fee amounts: - Phase | - Surveying and Base Map Phase.. - $32,000.00 ssesee $36,500.00 $68,500.00 — Phase Il - Design Phase Total Lump Sum Fee We anticipate completing the contract documents in three months from the time of authorization. S.\West OrangelProposals\24-02-13 MA FY 2024 NJDOT Municipal Aid Program.docx
File revisions (1)
- Sep 29, 2026
d32fd86d8eec42,519,504 bytes