Supporting Documentation · Mar 12, 2024
91-24 Attachment - Neglia.pdf
d32fd86d8eec085d1e5cc08ed221febe557b70a7ecfd094e978efdd27888acafIndexed text · page 94
Show all pagesASSOCIATES Zayibeth Carballo, Municipal Engineer February 13, 2024 Township of West Orange Our File No. 2024-037 Re: Professional Engineering & Surveying Services Page 4 2024 NJDOT Municipal Aid Program As requested, we have also included a separate fee for construction administration phase services as follows: Construction Administration Phase Services Our office will provide construction management of the roadway improvements for the anticipated contract time including the following services: 1. Coordinate and attend pre-construction meeting; Coordinate with the contractor to ensure compliance with the final contract documents; Provide assistance with interpretation of contract documents; Review shop drawings; Provide construction observation services; Prepare progress pay estimates; Prepare punch lists required to be addressed by the contractor prior to close out; Prepare final pay estimate and close out change order; and, Oe AO oO - © Coordinate with the Township and NJDOT Local Aid offices for reimbursement of the grant funding. Total Lump Sum Fee ..--- $50,000.00 Exceptions: e — Itis recommended that pavement cores be prepared prior to the design to identify locations where full pavement depth reconstruction is required. Our office has included in our fee obtaining quotes for pavement cores which would be authorized separately by the Township. e Construction Stake Out is not included in this scope of services. Should same be required, our office requests the opportunity to provide a fee for same. ¢ Any work not specified as listed in the above phases shall be considered additional services and will be invoiced at the time said work is authorized by the Township. ‘S:\West Orange\Proposals\24-02-13 MA FY 2024 NJOOT Municipal Aid Program.docx
File revisions (1)
- Sep 29, 2026
d32fd86d8eec42,519,504 bytes