Supporting Documentation · Mar 12, 2024
93-24 Attachment.pdf
c7a1433b14def597b1c29a07385c79255731982df5d1a6daf6827f68117be8e5Indexed text · page 66
Show all pagesNEGLIA PROJECT SUMMARY Belleville Stadium Improvements Township of Belleville, New Jersey The Township of Belleville selected the Neglia Group to perform geotechnical engineering services for a synthetic turf field at Belleville High School as well as providing structural engineering services for retaining walls at the stadium. The first phase of the geotechnical services included field work and analyses and the second phase included meeting with the Borough of Belleville and discussing ground improvement and preparing construction for the selected ground improvement. In terms of the retaining walls, Neglia is also responsible for design, construction documents, and specifications associated with segmental block retaining walls for the Belleville Stadium. Neglia sent a principal engineer to make regular visits to the site to ensure the project was making progress within the desired period. Services Provided: Project at a Glance Client: Township of Belleville Contact: Anthony D. lacono Township of Manager 973-450-3322 Survey Design Bid Documents Construction Management Completion: Fall 2021 Football Field Spring 2022 Track and Field Project Values Construction $4.6M. Design Services $390,000.0 LYNDHURST 34 Park Avenue PO Box 426 Lyndhurst, NJ 07071 p. 201.939.8805 f. 201.939.0846 MOUNTAINSIDE 200 Central Avenue Suite 102 Mountainside, NJ 07092 p. 201.939.8805 f, 732.943.7249
File revisions (1)
- Sep 29, 2026
c7a1433b14de30,275,629 bytes