Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Mar 12, 2024

93-24 Attachment.pdf

Preserved file SHA-256c7a1433b14def597b1c29a07385c79255731982df5d1a6daf6827f68117be8e5

Indexed text · page 67

Show all pages
Page 67

INN EXPERIENCED DEDICATED NEGLIA © zcsponsive negliagroup.com PROJECT SUMMARY Gunnell Oval Recreational Complex Kearny, New Jersey Neglia Group provided various engineering services to the newly renovated Gunnell Oval Recreational Complex, which consists of fourteen acres of multi-purpose artificial turf fields. The complex now houses two softball fields, two t-ball fields, three little league baseball-fields, two-pony-league &-high-school-baseball fields-with 50/70-conversion-options, and-six-overlaid-soccer fields with varying sizes that addresses all age groups from U6 through high school and adults. Aside from the artificial turf fields, the complex offers a playground, two outdoor fitness areas, two basketball courts, a volleyball court, and a tennis court. Adjacent to the playground is a picnic area and a two-story concession & broadcasting building with restroom facilities. The volleyball court also has a nearby one-story storage building with restroom facilities. The existing skate park has remained a part of the complex. A complete looping walkway has been constructed along the outer perimeter of the inner oval, along with interior walkways for full access to the different fields and amenities. Sports lights have been constructed for all the fields within the inner oval and site lights have been constructed along all walkways, driveways, and parking areas. Another key component of the project is the new stormwater pumping station located in the southeastern portion of the site which will drain the entire facility, along with East Midland Avenue, and discharge the stormwater directly into the Kearny Marsh. Project at a Glance Client: Town of Kearny Contact: Stephen D. Marks, PP, AICP, CFM, LEED-GA Town Administrator (201) 246-1418, Location: Kearny, NJ, Hudson County Services Provided: Design, Survey, Landscaping, Recreational Facility Design, Utilities Engineering, Construction Management, NJDEP & U.S. Army Corp of Engineers Permitting Completion: September 2020 Construction Value: $23 million, $1.5 million(Design) $1 million (Construction Management) LYNDHURST MOUNTAINSIDE 34 Park Avenue 200 Central Avenue PO Box 426 Suite 102 Lyndhurst, NJ 07071 Mountainside, NJ 07092 p. 201.939.8805 f. 201.939.0846 p. 201.939.8805 f. 732.943.7249

File revisions (1)