Supporting Documentation · Mar 26, 2024
98-24 Exhibits to the Agreement for the Operation of the Recycling Center - Part III.pdf
68c910198875599eb3cb29b323ce2a84d709c2beecc214c0e5e09084fbe5fec3Indexed text · page 37
Show all pagesRELIABLE WOOD PRODUCTS LLC 132312 CBG180002 Class B Recycling Ctr General Apprv -Renewal Requirements Report Subject Item: RCBG308510 - Class B Materials 60. 61. 62. 63. Any suspected or prohibited hazardous waste, as defined at N.J.A.C. 7:26G-5, found in a load accepted at the recycling center shall not be retumed to the generator. Such materials shall be segregated and stored in a secure manner and shall be immediately reported to the N.J.D.E.P. Environmental Action Hotline at 1-877-927-6337. The owner/operator of the recycling center shall secure the name ofthe collector/hauler suspected of delivering such waste to the facility and related information surrounding the incident, if available, and shall make this information known to N.1.D.E.P. enforcement personnel. Such material may be retumed to a known generator, provided that specific permission to do so is received by the owner/operator after contacting 1-877-927-6337, Otherwise, the owner/operator shall dispose of the unauthorized waste in accordance with instructions received from the Department, (N.J.A.C. 7:26A- 3.5(e)] Pursuant to N.J.A.C. 7:26A-3.11(a), the holder of this general approval shall obtain prior approval from the Department for any increase in the design capacity of the facility. The facility shall submit a tequest to the Department, in writing, for the proposed increase and shall submit updated information pursuant to the requirements of N.J.A.C. 7:26A-3.2(a), 3.4, or 3.8, as applicable. The facility shall also provide written notice of the request to the solid waste or recycling coordinator of the applicable district. [N.J.A.C. 7:26A-3.5(@)] Pursuant to N.J.A.C. 7:26A-3.2(a)18, the holder of the general approval shall ensure that all recycling activities authorized by this general approval are conducted in full compliance with the applicable Stormwater Management rules at N.J.A.C. 7:8-5 and 6 and the Pollutant Discharge Elimination System rules at N.J.A.C. 7:14-24 and 25. In the event that compliance with the above rules require changes to the site plan or any operations authorized by this general approval, the holder of the general approval shall submit a modification application including a revised site plan within thirty (30) days of receiving all approvals/permits from the Department’s Division of Water Quality to the Bureau of Recycling & Hazardous Waste Management for
ion including a revised site plan within thirty (30) days of receiving all approvals/permits from the Department’s Division of Water Quality to the Bureau of Recycling & Hazardous Waste Management for review and approval. [N.J.A.C. 7:26A- 3.2(a)18] If at any time, the total amount of processed and unprocessed material stored onsite reaches the maximum authorized capacities shown on the approved site plan, the recycling center shall immediately cease receiving additional unprocessed material until the amount of processed and unprocessed material stored onsite falls below the total authorized storage capacity. Under such circumstance, arrangements shall be made to transfer processed material offsite, While transferring processed material offsite, any processed material stored in the unprocessed storage area shall be transferred first. [N.J.A.C. 7:26A- 3.5(e)] Page I-7 of L-9
File revisions (1)
- Sep 29, 2026
68c91019887520,799,698 bytes