Supporting Documentation · Mar 26, 2024
98-24 Exhibits to the Agreement for the Operation of the Recycling Center - Part III.pdf
68c910198875599eb3cb29b323ce2a84d709c2beecc214c0e5e09084fbe5fec3Indexed text · page 68
Show all pagesRELIABLE WOOD PRODUCTS LLC 132685 CBG190002 Class B Recycling Ctr General Apprv -Renewal Requirements Report Subject Item: RCBG799457 - Class B Recycling Facility 64. 65. The following processing equipment or equivalent are authorized for site operations and shall be maintained in operable conditions: 2017 Case 921 Loader (2 units) 2015 John Deere 644K Loader 2015 Doosan DL350 Loader 2017 Case 300 Excavator 2013 John Deere 250G Excavator 2013 Diamond Z 7000 Grinder 2018 Doppstadt 720 Screener 2014 Royer 620H Screener 2018 McClosky 628 Colorizer 2008 Finaly Stacker (2 units) If any of the above listed equipment need to be replaced, the holder of this general approval must notify the Bureau, within two (2) weeks of of such replacement, along with specifications for the relacement equipment at the following mailing address: New Jersey Department of Environmental Protection, Division of Solid and Hazardous Waste, Bureau of Recycling and Hazardous Waste Management, P.O. Box 420, Mail Code 401-02C, Trenton, New Jersey 08625-0420. Where applicable, the holder of this general approval must apply to the Department for any air permits required for the replacement equipment. Requisite recycling operations shall not be delayed or neglected for lack of required equipment or for equipment down time. [N.J.A.C. 7:26A- 3.5(e)] Pursuant to N.J.A.C. 7:26-3.2(a)18, the holder of the general approval shall ensure that all recycling activities authorized by this general approval are conducted in full compliance with the applicable Storm Water Management rules at N.J.A.C. 7:8-5 and 6 and the Pollutant Discharge Elimination System rules at NJ.A.C. 7:14A-24 and 25. In the event that compliance with the above rules require changes to the site plan or any operations authorized by this general approval, the holder of the general approval shall submit a modification application including a revised site plan within thirty (30) days of receiving all approvals/permits from the Department's Division of Water Quality to the Bureau of Recycling and Hazardous Waste Management for review and approval. [N.J.A.C. 7:26A- 3.5(e)] Page L-9 of 9
File revisions (1)
- Sep 29, 2026
68c91019887520,799,698 bytes