Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Apr 24, 2024

138-24 Exhibit to Resolution Adopting the Township of West Orange Vision Zero Action Plan.pdf

Preserved file SHA-256f6a71245adb1a6c32d7a456d59b7e524262887c178a630b8b9517ea827494fde

Indexed text · page 102

Show all pages
Page 102

hP nt Va i gv converted to Roundabout: 82% reduction lp ll ou ey do n Wa Lo n M y in fatal and injury crashes

Page 102

in fatal and injury crashes Ra • Signalized Intersection to Roundabout: 78% reduction in fatal and injury crashes Cherr y Lan *Includes cost of roundabouts and cost of countermeasures that overlap e with intersecting corridors. Roundabouts are subject to additional feasibility and cost studies, and estimates do not account for Right-of-Way acquisition. Estimated cost does not include lighting improvements (additional studies are recommended). Cost estimates are primarily based on the NJDOT 2022 Estimated cost estimate guidelines for safe routes. https://www.saferoutesnj.org/wp- content/uploads/2022/05/Design-Treatment-Estimating-Guidelines.pdf Construction Cost: ** Although not specifically a Proven Safety Countermeasure,

Page 102

ing-Guidelines.pdf Construction Cost: ** Although not specifically a Proven Safety Countermeasure, traffic signal timing update/optimization should be included as part of Road Diet/ Reconfiguration, Left- and Right-Turn Lanes, Leading Pedestrian Intervals, ~$600,000* and Protected-Only Left Turn Signal Phasing alternatives. WEST ORANGE TOWNSHIP: VISION ZERO ACTION PLAN 101

File revisions (1)