Supporting Documentation · Apr 24, 2024
138-24 Exhibit to Resolution Adopting the Township of West Orange Vision Zero Action Plan.pdf
f6a71245adb1a6c32d7a456d59b7e524262887c178a630b8b9517ea827494fdeIndexed text · page 116
Show all pagesGuild Carm Acad el emy Rd El m St Ch er Ave ry St Ave sey rk Te Colg RECOMMENDED PROVEN SAFETY klin r ate ittle I P le ark idd COUNTERMEASURES** n on M Wh Fra Edis hool Sc Ri dg Ave ve W eA • High-visibility crosswalks: 40% reduction t hS illi ve ng A am
ve ng A am in pedestrian injury crashes son Hig St chu Wat • Intersection lighting: 42% reduction Wat hing ton in pedestrian crashes Was ool Sch Wa • Advance yield or stop markings and signs: sh ing ton 25% reduction in pedestrian crashes St St • Reduction in pedestrian crashes by 47% de St ea ia M • Increase of motorist yielding rates up mb
• Increase of motorist yielding rates up mb to 98% (depending on context) lu Co • Sidewalks: 16-89% reduction in crashes e nu involving pedestrians walking along roadways Ave e Av klin nd • A driver traveling at 30 miles per hour who ve hla Fran hA hits a pedestrian has a 45 percent chance of As dis e killing or seriously injuring them. At 20 miles nu an Ave per hour, that percentage drops to 5 percent. St e Pa sey rk ittle Wh e
ittle Wh e nu Ave son Wat Ridg e Av enu e Will iam Stre et Estimated Construction Cost: ~$300,000* *Includes cost of countermeasures that overlap with intersecting corridors. Estimated cost does not include lighting improvements (additional studies are recommended). Cost estimates are primarily based on the NJDOT 2022 cost estimate guidelines for safe routes. https://www.saferoutesnj.org/wp-content/ et uploads/2022/05/Design-Treatment-Estimating-Guidelines.pdf Stre
uploads/2022/05/Design-Treatment-Estimating-Guidelines.pdf Stre h **Although not specifically a Proven Safety Countermeasure, traffic signal HIg timing update/optimization should be included as part of Road Diet/ Reconfiguration, Left- and Right-Turn Lanes, Leading Pedestrian Intervals, and Protected-Only Left Turn Signal Phasing alternatives. WEST ORANGE TOWNSHIP: VISION ZERO ACTION PLAN 115
File revisions (1)
- Sep 29, 2026
f6a71245adb190,489,696 bytes