Supporting Documentation · Apr 24, 2024
138-24 Exhibit to Resolution Adopting the Township of West Orange Vision Zero Action Plan.pdf
f6a71245adb1a6c32d7a456d59b7e524262887c178a630b8b9517ea827494fdeIndexed text · page 4
Show all pagesTABLE OF CONTENTS A LETTER FROM THE MAYOR 6 GLOSSARY OF TERMS 9 VISION ZERO GOAL 11 USDOT ROADWAY SAFETY STRATEGY 15 ROADMAP TO VISION ZERO 17 TRAFFIC SAFETY TRENDS 23 HIGH-INJURY NETWORK 32 ENVIRONMENTAL JUSTICE 36 PRIORITIZED HIGH-INJURY NETWORK 40 ENGAGEMENT OVERVIEW 43 VISION ZERO ACTION PLAN 57 PRIORITY HIN CORRIDOR PROJECTS 82 NEXT STEPS 87 APPENDIX A: PRIORITY HIN PROJECTS: FACT SHEETS 89 APPENDIX B: FHWA PROVEN SAFETY COUNTERMEASURES117 APPENDIX C: FUNDING SOURCES 129 APPENDIX D: OVERALL HIN CORRIDOR LIST 137 APPENDIX E: DESIGN GUIDANCE 149 APPENDIX F: SURVEY RESULTS 157
File revisions (1)
- Sep 29, 2026
f6a71245adb190,489,696 bytes