Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 4 Flood Hazard Area Control Act Rules (FHA) The proposed improvements are near and within the regulated areas of the Crystal Lake. Crystal Lake is considered a FW2-NT water (according to the rules found within the Surface Water Quality standards found at N.J.A.C. 7:9B) and as a result will require a 50-foot riparian zone (as found at N.J.A.C. 7:13-4.1). Additionally, Crystal Lake is mapped as a FEMA Flood Zone A with no base flood elevations determined. Given the proposed improvements may take place within the riparian zone or within the flood hazard area, various Flood Hazard Area Permits may be required including but not limited to, Permit-by-Rules, General Permits, or an Individual Permit. If the project is considered a major development in terms of stormwater, as in there will be more than 1 acre of ground disturbance or more than ¼ acre of new impervious surface, an Individual Permit will be required. Once the concept plan is developed, the specific permits required will be identified and discussed with the NJDEP during a pre-application meeting. Based on a preliminary review of USGS StreamStats, Crystal Lake appears to drain less than 50 acres and therefore would not have a flood hazard area associated with it (in accordance with N.J.A.C. 7:13-2.3). CME will confirm these findings and discuss with the NJDEP during the pre-application meeting. CME will prepare and submit all required information for a NJDEP Permit application based on the final design. This includes preparing public notices, an Environmental Report demonstrating compliance with the regulations, permit plans, and a stormwater/design report where necessary. It is understood that the permit fees are the responsibility of the Township. Freshwater Wetland Protection Act Rules While freshwater wetlands are not mapped on site, it is probable that wetlands will exist within the vicinity of Crystal Lake. As such, a site visit will be conducted to confirm these findings. If wetlands are identified in the area, it is likely that the wetlands will be considered intermediate resource value and require a 50-foot transition area (as found at N.J.A.C. 7:7A-3.3(d)). Should freshwater wetlands, transition areas, or State open
y that the wetlands will be considered intermediate resource value and require a 50-foot transition area (as found at N.J.A.C. 7:7A-3.3(d)). Should freshwater wetlands, transition areas, or State open waters be disturbed for this project, various General Permits will be required including but not limited to General Permit 11 – outfalls and intake structures, General Permit 17 – trails and boardwalks, General Permit 19 – docks and piers, General Permit 20 – bank stabilization, General Permit 21 – above ground utility lines, or General Permit 25 – minor channel or stream cleaning for local S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 5 government agencies. The project will be required to comply with various requirements specific to each permit. Once the concept plan is developed, the specific permits required will be identified and discussed with the NJDEP during a pre-application meeting. CME will prepare and submit all required information for a NJDEP Permit application based on the final design. This includes preparing public notices, an Environmental Report demonstrating compliance with the regulations, permit plans, and a stormwater/design report where necessary. It is understood that the permit fees are the responsibility of the Township. Site Investigation Based on a preliminary desktop assessment of the environmental conditions revealed within the NJDEP’s GeoWeb online GIS resource and the USDA Web Soil Survey, freshwater wetlands do not appear to be located within the project area. Therefore, CME will conduct a site visit to confirm these findings, utilizing the methodologies outlined in the Federal Manual for Identifying and Delineating Jurisdictional Wetlands (1989), as required by the NJDEP under the Freshwater Wetlands Protection Act Rules. If wetlands are present, the wetland/upland boundaries will be determined based upon field examination of topography, hydrology, soils, and vegetation characteristics at the site. Additionally, CME will also identify top of bank for regulated waters within the proposed work area to accurately represent the riparian zones associated with the State open waters adjacent to the site. Top of bank is typically characterized by an observable change or break in the slope of the land along a regulated water. In the event this break is not identifiable, other methods described in Flood Hazard Area Control Act Rules will be utilized to define top of bank. State Historic Preservation Office (SHPO) The project site is not mapped as a historic property, historic district, or historic archeological site according to the Departments NJ-GeoWeb online GIS resources. As such, SHPO comments are not anticipated while the wetlands application is being reviewed. This will be discussed during the pre-application meeting. Geotechnical Phase This phase includes an exploration of the
O comments are not anticipated while the wetlands application is being reviewed. This will be discussed during the pre-application meeting. Geotechnical Phase This phase includes an exploration of the subsurface soil and groundwater conditions within the zone of influence of the proposed construction and evaluation of soil conditions with respect to their engineering properties. These investigations will be critical to the placement, S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 6 design, and permitting if stormwater improvements are required. Soil testing will be carried out in accordance with the requirements of the N.J.A.C. 7:8 and the NJ Stormwater Best Management Practices Manual, Chapter 12. Soil Exploration – CME Associates will conduct up to 10 soil profile pit assessments to depths of 12-15 feet below grade or until the water table is encountered. These assessments will be conducted in accordance with the NJDEP’s Stormwater Best Management Practices Manual, Chapter 12: Soil Testing Criteria. A minimum of one (1) soil sample will be collected in the most hydraulically restrictive soil layer above the seasonal high-water table elevation and below the bottom of the proposed basin in each pit. Permeability testing will be conducted utilizing the tube permeameter methodology. The results of the test pits and permeability testing will be included in the Stormwater Management Report/Drainage Narrative. NJDEP Regulatory permit fees are to be provided by the Township at the time of the application. 3. HUDSON-ESSEX-PASSAIC SOIL CONSERVATION DISTRICT (SCD) It is anticipated that Certification by the Hudson-Essex-Passaic SCD will be required due to the limits of disturbance. Our office will prepare and submit the following items in support of the SCD application: SCD application form; Soil Erosion and Sediment Control Plans in accordance with “Standards” pursuant to N.J.S.A. 4:24-39 and N.J.A.C. 2:90-1.1; Revisions as requested from the SCD within the 60-day review & approval period; and Request for NJDEP Stormwater General Permit Authorization (RFA) to discharge stormwater from a construction site. The SCD certification, inspection, and administrative fee and RFA is to be provided by the Township at the time of the applications. 4. FINAL DESIGN SERVICES The work under this task will include the following: A. Prepare Preliminary Plans and Cost Estimate for final review and approval; S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 7 B. Prepare a Drainage Report; C. Prepare a Final Plan Set incorporating Township Comments to include but not be limited to the following: Cover Sheet with location map General and Construction Notes with legends Existing Conditions/Survey Plan Control Plan Demolition Plan Construction Plan Grading Plan and Earthwork Summary Utility Plan including profiles Landscaping Plan Soil Erosion and Sediment Control Plan and Details Traffic Control and Detour Plans and Construction Details D. Prepare Specifications; E. Prepare Final Engineer’s Estimate; and, F. Attend four (4) meetings with the Township Officials for Kickoff, Preliminary Design, Public Presentation and Final Design. 5. BID PHASE The work under this task will include the following: A. Provide 20 sets of plans and specifications; B. Respond to Request for Information (RFI) during the bid period; C. Issuance of Addenda(s) to the Qualified Purchasing Agent; D. Bidding documents (plans and specifications) deliverables to the Township via AutoCAD, hard copy and PDF files. S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 8 Fee Estimate We will provide the necessary engineering services as described above based upon the cost breakdown as noted below: A. Land Surveying Services..................................................... $40,000.00 B. Civil Engineering Services................................................... $80,000.00 C. Soil Conservation District ...................................................... $1,500.00 D. Final Design Services.......................................................... $35,000.00 E. Bid Phase Services ............................................................... $3,500.00 Total Lump Sum Fee for Services ....................................... $160,000.00 Construction Administration Services (Separate Fee) The following services will be provided under this phase: A. Contract preparation including review of bonds, insurance certificates and project manning reports; B. Attend preconstruction meeting; C. Provide assistance with interpretation of contract documents; D. Review shop drawings for site-related items; E. Provide construction observation services, prepare contractor punch lists and review and prepare pay estimates; and, F. Perform project close out and final pay estimate/close out change order. The Lump Sum fee for Construction Administration Services is $60,000.00. Exceptions: Any work not specified as listed in the above phase shall be considered additional services and will be invoiced at the time said work is authorized by the Township. S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Ms. Zayibeth Carballo Township of West Orange Re: Professional Engineering Services Oskar Schindler Performing Arts Center and Crystal Lake Improvements October 24, 2024 Page 9 Should this fee estimate meet your approval, please provide our office with a professional services agreement or resolution as an indication of the work to proceed. In the meantime, should you have any questions concerning this matter, please do not hesitate to contact this office. Very truly yours, CME Associates Trevor J. Taylor, PE, PP, CME, CFM For the Firm TT/ab/pv S:\West Orange\Proposals\24-10-24 West Orange OSCPA and Crystal Lake.docx
Proposal For Professional Services Oskar Schindler Performing Arts Center (OSPAC) And Crystal Lake Improvements West Orange Township, Essex County, New Jersey October 25, 2024 Submitted to: West Orange Township
Oskar Schindler Performing Arts Center and Crystal Lake Improvements Table of Contents Statement of Interest SECTION 1 Scope of Services / Fee Schedule SECTION 2 Personnel Assignments SECTION 3 Sample Insurance Certificate