Supporting Documentation · Nov 25, 2024
315-24 Attachment.pdf
c9471b3ee2388cd22f24dea606c27b627faee2173fee1ee0ef818a1273b1c7dcIndexed text · page 41
Show all pagesPHASE 4 - CONSTRUCTION STAGE ITEM 1: Limited Construction Support Services Matrix will provide the following construction support activities during the duration of the construction project: Attend one (1) pre-construction meeting Provide drawings to the contractor for obtaining construction permits (3 sets) for the project. It is the contractor’s responsibility to file and obtain all construction permits for the project Review contractors shop drawings. This includes review of up to one (1) resubmittal of a specific shop drawing Review contractor’s application for payment Provide full-time field observations which will include any progress site meetings during the construction of the project (4-week construction period as stated in the RFP) Provide a punch list for the project If the project extends beyond the construction period described above or the Township requests additional site visits/meetings our office will provide a scope and fee for the additional time required for the project. FIXED FEE: $29,050.00 LIMITED DIRECT EXPENSES Direct expenses are an estimated cost which includes printing, postage (including certified notifications), travel, and other miscellaneous project-related costs. The amount may vary based on the additional requirements of the project and will be billed at the rates provided in this proposal. ESTIMATED FEE: $1,500.00 TOTAL FEE FOR PHASES 1, 2,3 AND DIRECT EXPENSES: $134,500.00 TOTAL FEE FOR PHASE 4: $29,050.00 ASSUMPTIONS AND EXCLUSIONS All work areas are accessible. NJDEP Green Acres Program submission or review is excluded Costs assume that the work described above will be performed in Level D personal protective equipment (PPE) Costs do not include any activities beyond what is included in this proposal. This proposal does not include costs to retain an LSRP Geotechnical investigation or reports Site specific seismic evaluation Construction oversight or inspection services beyond what is listed above Application for any permits or approvals not specifically described above are excluded Application fees are excluded 9
File revisions (1)
- Sep 29, 2026
c9471b3ee2387,412,771 bytes