Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 25, 2024

315-24 Attachment.pdf

Preserved file SHA-256c9471b3ee2388cd22f24dea606c27b627faee2173fee1ee0ef818a1273b1c7dc

Indexed text · page 5

Show all pages
Page 5

of permitting and construction plans; C. Map the location of wetlands, buffers, riparian zones, limits of the 100-Year Flood Hazard Area (FHA) and top of bank location as per Professional Wetlands Scientist and Engineer; D. Location of tree canopy around the lake needs to be established; E. Sufficient topographic information is to be provided for the design of proposed curb ramps and ADA accessible areas; F. Establish horizontal control based on North American Datum 1983 (New Jersey State Plane Coordinate System-NAD 83) and North American Vertical Datum 1988 (NAVD 88); G. Establish water surface elevation of Crystal Lake; H. Benchmark(s) to be set on site for future use; I. Existing conditions/Survey Control plan; J. Coordinate utility mark-outs; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey is to be provided to the Department of Engineering. CIVIL ENGINEERING SERVICES: I. CONCEPT PHASE & NJDEP PRE-APPLICATION MEETING A. Concept Plans for the overall proposed improvements A. Develop two (2) color renderings; B. Preparation of NJDEP Pre-Application Package for application meeting request; (See attached checklist) C. Confirm and establish Drainage Area for this project as to whether or not is greater than 50 acres to establish whether or not it has a regulated floodplain; D. Establish the still water surface elevation for Crystal Lake to determine; E. Wetlands delineation, buffers and riparian zones; F. Attend Pre-Application meeting and draft meeting notes; G. Provide design recommendations to the Township based on NJDEP’s feedback, regulatory challenges, design conflicts and project feasibility; H. Determine/discuss the appropriate improvements in conjunction with Township and its representatives for the best course of action to facilitate the project goals. II. NJDEP PERMITTING SUBMISSION PACKAGE Preparation of NJDEP Permitting Package following the feedback obtained form Civil Engineering Services Task I. It is anticipated that the following permits will be required:  Prepare and submit a complete NJDEP application requirement under the Freshwater Wetlands Protection Act Rules N.J.A.C. 7:7A since it is probable that FWW exist within the vicinity of the project. Some general permits include but not limited to are as needed, minor outfalls and intake structures (GP 11), Trails and Boardwalks (GP 17) Docks

Page 5

able that FWW exist within the vicinity of the project. Some general permits include but not limited to are as needed, minor outfalls and intake structures (GP 11), Trails and Boardwalks (GP 17) Docks and piers (GP 19), bank stabilization (GP 20), above ground utility lines (GP 21), and minor 3 AN EQUAL OPPORTUNITY EMPLOYER www.westorange.org

File revisions (1)