Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 25, 2024

315-24 Attachment.pdf

Preserved file SHA-256c9471b3ee2388cd22f24dea606c27b627faee2173fee1ee0ef818a1273b1c7dc

Indexed text · page 52

Show all pages
Page 52

BARTHOLOMEW C. WYNESS, PLS, CH Survey Department Manager NYCDPR Captain George H. Tilly Park, Landscape Design and Survey Services – Project Manager for all survey services associated with topographic, utility, boundary and bathymetric surveying related to landscape design services for the reconstruction of the pond, retaining wall and drainage, and miscellaneous site work. NYCEDC Lower Manhattan Coastal Resiliency (EDC Project Number #7788) - Project Manager responsible for topographic, boundary and utility survey of Battery Park, Manhattan, New York City. NYCDPR MacNeil Park, Queens, NY Civil Engineering Design Services – Project Manager for all survey services associated with topographic, utility, boundary and photogrammetric surveying related to civil engineering services for the reconstruction of the seawall, and miscellaneous site work. NYCDPR South Rochdale Playground Area. Landscape Architecture Design & Survey Services – Project Manager for all survey services associated with topographic, utility, boundary and surveying related to landscape architecture services for the reconstruction of playground area. NYCDPR Mullaly Bike Park Reconstruction, Borough of The Bronx – Project Manager for all survey services associated with topographic, utility, boundary and photogrammetric surveying related to Landscape Architectural Design Services to prepare Construction Documents. NYCT MTA CM-1686 Various Task Orders - SBMP (Station Stairs) - Project Manager responsible for surveying services associated with the ADA update of station stairs throughout the 5-Boroughs. NYCEDC On Call Surveying Services (Various Task Orders)- Project Manager for surveying services associated with shoreline protection projects. NYCOMB and NYCDPR, Facility Conditions Assessment & Structural Investigation of The Thomas Jefferson Recreation Center & Pool Complex, Thomas Jefferson Park – Project Manager for all survey services associated with topographic, utility, boundary and surveying related to pre-scoping services for a Facility Conditions Assessment and Structural Investigation of the Thomas Jefferson Recreation Center (TJRC) and Pool Complex in Thomas Jefferson Park. NYCDEP BWSO Surveying Services (Various Task Orders)– Project Manager responsible for all surveying services associated with property acquisition, infrastructure design, confirmation of legal boundaries and

Page 52

BWSO Surveying Services (Various Task Orders)– Project Manager responsible for all surveying services associated with property acquisition, infrastructure design, confirmation of legal boundaries and grades, wetland delineation, or other feature mapping as described in the List of Potential Services. NYC MTA Metro-North Railroad: Rehabilitation of the Grand Central Terminal Train Shed- Project Manager responsible for topographic, boundary and utility survey at street level and tunnel level, Park Avenue, Manhattan, New York City. (2020-present) NYCT MTA CM-1533 Task Orders # 3 & 4 Additional Design Services Multiple Substation Facilities- Project Manager responsible for topographic, utility and boundary surveys of 15 substations, Manhattan, Brooklyn and Queens, New York City. NYCDEP GI-S Design-1 Task Order Contract for Design Services for Green Infrastructure – Doe, NYC– Project Manager responsible for topographic, boundary and utility surveys of various green infrastructure school sites throughout New York City. NYCEDC Ferry System Consulting Services, New York City- Project Manager responsible for bathymetric and topographic survey of various proposed potential ferry terminal sites, New York City. C.E.P.D. Tidal Study, USACE, NY District, NY – As Project Manager for multiple CEPD projects for the Army Corps NY District, responsible for all planning, field work coordination, computations, data analysis and reporting for these projects consisting of remote tidal monitoring, static, RTN GNSS, and traditional land survey methodologies. Results from these surveys and analysis were used to confirm the MLLW datum determination and its correlation with NOAA’s datum determination as used on the various USACE Federal channel projects.

File revisions (1)