Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 10, 2024

347-24 RFP - 2024 CDBG Responses.pdf

Preserved file SHA-25622835f3e2f5342ddb547bccb65ed42a8e853cd3dd62a882003bdb9aa10d07ab6

Indexed text · page 10

Show all pages
Page 10

2024 CDBG Road Rehabilitation C. Benchmark(s) to be set on site for future use; D. Existing Conditions/Survey Control plan; E. Coordinate utility mark-outs; As part of the deliverables, an electronic AutoCAD file of the Boundary and Topographic Survey will be provided to the Township. 2. CIVIL ENGINEERING SERVICES A. B. C. D. E. F. G. H. I. J. K. Proposed roadway profiles matching existing grades; Roadway improvements include curb, sidewalk, aprons, pavement milling and resurfacing, pavement striping, new traffic signs, shade trees; Curb ramp plans and details as necessary; New drainage improvements as necessary; Drainage structure repairs with new frames, grates, curb pieces as necessary; New manhole castings, frames and covers as necessary. Repair existing manholes as necessary; Coordinate with WO Traffic Bureau for the preparation of traffic control and detour plans; Prepare construction details; Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, Traffic Control and Detour Plans, and Construction Details; Include one (1) meeting with Township Officials for Preliminary Design; Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy and PDF files. The total length of this project is approximately 1,924 linear feet. SCOPE OF WORK I. Topographic and Existing Condition Surveying Services A boundary survey is not included in the scope of services. Right-of-way will be shown from Township Tax Map and County GIS information. A. We will conduct a field survey for Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue within the project scope and all adjacent intersections. The project length for all four (4) roads is approximately 3,581 linear feet. The survey will include the following: ▪ Establishing of elevation benchmarks outside of the anticipated area of construction. Benchmarks will be placed at the beginning and end of project limit, and at least two in the construction limits. Vertical control will be based on NAVD 1988. Detailed descriptions of the elevation benchmarks shall be shown on the Plan

Page 10

ginning and end of project limit, and at least two in the construction limits. Vertical control will be based on NAVD 1988. Detailed descriptions of the elevation benchmarks shall be shown on the Plan Sheets. Section I | Page 2

File revisions (1)