Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Dec 10, 2024

347-24 RFP - 2024 CDBG Responses.pdf

Preserved file SHA-25622835f3e2f5342ddb547bccb65ed42a8e853cd3dd62a882003bdb9aa10d07ab6

Indexed text · page 12

Show all pages
Page 12

2024 CDBG Road Rehabilitation I. All design criteria will comply with the current NJDOT and MUTCD specifications. J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Roadway improvements will be included at the intersection with Chestnut Street. 2. Curb ramps to be reconstructed as required. 3. Improvements at the intersection of Franklin and Main are excluded from this proposal. 4. No modification or upgrades in county or NJDOT right-of-way or jurisdiction. 5. Excludes modification or upgrades to bridges/approaches or traffic signal equipment. Section I | Page 4

File revisions (1)