Supporting Documentation · Dec 10, 2024
347-24 RFP - 2024 CDBG Responses.pdf
22835f3e2f5342ddb547bccb65ed42a8e853cd3dd62a882003bdb9aa10d07ab6Indexed text · page 13
Show all pages2024 CDBG Road Rehabilitation Section II: Fee Schedule Surveying & Design Our fee for the tasks outlined above is: Franklin Avenue, from Main Street to Chestnut Street and Oxford Place, from Cherry Street to Chestnut Street Survey $8,820.00 Design $17,788.00 Total Fee $26,608.00 FEE SCHEDULE – Construction Inspection & Certification of Completion The time required to perform construction inspection services is a function of established contract duration(s), contractor’s schedule, and the Township’s need for part-time or full-time inspection. We will provide construction inspection services to fit with the Township’s needs. The services will be provided on an hourly basis. Our fee for the above referenced services is as follows: Construction Administration/Construction Inspection Services Construction Inspection Overtime Rate $105.00/hr. $157.50/hr. HOURLY BILLING RATES As submitted in our Qualification package to the Township of West Orange on November 28, 2023, the following are our municipal billing rates for 2024: PROFESSIONAL ENGINEER SENIOR PROJECT MANAGER, ENGINEERING SENIOR PROJECT MANAGER, LANDSCAPE ARCHITECTURE SENIOR DESIGNER DESIGNER INSPECTOR INSPECTOR OVERTIME RATE ENGINEERING TECHNICIAN $ $ $ $ $ $ $ $ 180.00 160.00 150.00 125.00 95.00 105.00 157.50 85.00 PROFESSIONAL LAND SURVEYOR SENIOR PROJECT MANAGER, SURVEYING PROJECT SURVEYOR SURVEYING TECHNICIAN PARTY CHIEF INSTRUMENT PERSON ADMINISTRATIVE SUPPORT $ $ $ $ $ $ $ 170.00 150.00 135.00 105.00 110.00 95.00 75.00 Section II | Page 5
File revisions (1)
- Sep 29, 2026
22835f3e2f534,521,947 bytes