Supporting Documentation · Dec 10, 2024
347-24 RFP - 2024 CDBG Responses.pdf
22835f3e2f5342ddb547bccb65ed42a8e853cd3dd62a882003bdb9aa10d07ab6Indexed text · page 31
Show all pages2. Existing Conditions/Survey Control Plan 3. Demolition Plan 4. Construction Plans 5. Grading and Utility plan 6. ADA compliant curb ramp plans 7. Pavement striping 8. New traffic signs as necessary 9. Soil Erosion and Sediment Control Plans and Details 10. Reset drainage structures, manhole castings, frames and covers as necessary. 11. Construction Details c. Prepare contract documents and specifications required for public bid in accordance with the New Jersey Local Public Contracts Law. Detailed specifications will be provided for the items to be included in the contract. Twenty (20) sets of contract documents including AutoCAD and PDF files will be provided. d. Attend one (1) meeting with Township Officials for Preliminary Design. Summary of Fee Estimates We will provide the necessary engineering services as described above based upon the following lump sum fee amounts: Phase I – Surveying and Base Map Phase .............................................................. $18,000.00 Phase II – Design Phase ........................................................................................... $22,000.00 Total Lump Sum Fee ......................................................................................................... $40,000.00 We anticipate completing the contract documents in three months from the time of authorization. As requested, we have also included a separate fee for construction administration phase services as follows: Construction Administration Phase Services Our office will provide construction management of the roadway improvements for the anticipated contract time including the following services: 1. Coordinate and attend pre-construction meeting; 2. Coordinate with the contractor to ensure compliance with the final contract documents;
File revisions (1)
- Sep 29, 2026
22835f3e2f534,521,947 bytes