Supporting Documentation · Dec 10, 2024
348-24 RFP - MA 2025 NJDOT Responses.pdf
f39f3515c4c8d6c91e63248821e1ff3eb33a84b1f5c2c125e4e1eccd687a3cbaIndexed text · page 11
Show all pagesMA 2025 NJDOT Aid Program J. We will prepare a complete set of specifications. K. A final Engineer’s Estimate of Construction will also be prepared. L. All plans and specifications will be in accordance with New Jersey Department of Transportation Standard Specifications, and we will submit them for review by the NJDOT Local Aid Office. M. We will prepare and submit twenty (20) sets of Contract Documents. ASSUMPTIONS 1. Full project length will be mill and overlay. No change to existing profile or cross-slopes. 2. Partial or full curb and sidewalk replacement assumed for all roads. 3. Proposed sidewalk where there is no existing sidewalk is excluded from this proposal. 4. ADA curb ramp reconstruction as required. 5. Drainage improvements as required. 6. GPI assumes all railing, guide rails, steps, retaining wall or landscape walls will remain as-is. Replacement of these features is not anticipated and is excluded from this proposal. Section I | Page 4
File revisions (1)
- Sep 29, 2026
f39f3515c4c84,273,578 bytes