MA 2025 NJDOT Aid Program C. D. E. F. G. H. I. J. K. Curb ramp plans and details as necessary; New drainage improvements as necessary; Drainage structure repairs with new frames, grates, curb pieces as necessary; New manhole castings, frames and covers as necessary. Repair existing manholes as necessary; Coordinate with WO Traffic Bureau for the preparation of traffic control and detour plans; Prepare construction details; Plan Set to include but not limited to Cover Sheet, Existing Conditions/Survey Control Plan, Demolition Plan, Construction Plan, Grading and Utility Plan, Soil Erosion and Sediment Control Plan and Details, Traffic Control and Detour Plans, and Construction Details; Include one (1) meeting with Township Officials for Preliminary Design; Bid Package that includes bid set of plans and construction specifications in accordance with public bidding laws; Bidding documents (plans and specifications) are to be part of the deliverables to the Township via AutoCAD, hard copy and PDF files. The total length of each road is approximately: Helen Avenue Lawrence Avenue Florence Place Lowell Avenue 635 linear feet 719 linear feet 722 linear feet 1,505 linear feet The total length of roads is approximately 3,581 LF. SCOPE OF WORK I. Topographic and Existing Condition Surveying Services A boundary survey is not included in the scope of services. Right-of-way will be shown from Township Tax Map and County GIS information. A. We will conduct a field survey for Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue within the project scope and all adjacent intersections. The project length for all four (4) roads is approximately 3,581 linear feet. The survey will include the following: ▪ Establishing of elevation benchmarks outside of the anticipated area of construction. Benchmarks will be placed at the beginning and end of project limit, and at least two in the construction limits. Vertical control will be based on NAVD 1988. Detailed descriptions of the elevation benchmarks shall be shown on the Plan Sheets. ▪ Location of all topographic features within the existing right-of-way and fifty (50) feet up any intersecting streets. These features will include buildings, curbs, sidewalks, driveways, depressed curbs, driveway aprons, sidewalk depressed curbs, steps, walls, pillars, fences, guide rail, trees greater than 4” Section I | Page

Page 9

ures will include buildings, curbs, sidewalks, driveways, depressed curbs, driveway aprons, sidewalk depressed curbs, steps, walls, pillars, fences, guide rail, trees greater than 4” Section I | Page 2

File revisions (1)