Supporting Documentation · Sep 30, 2025
215-25 Exhibits - NJDOT_GPI.pdf
18b58046b1c9c1d936d6cba6f99d6d50d0ac39002a44186ca481550e144e6d76Indexed text · page 15
Show all pagesExhibit A Page 12 of 23 Zayibeth Carballo, PE, Township Engineer May 16, 2025 Township of West Orange Revised June 25, 2025 Obtain Construction Environmental Reevaluation (4860): GP! will provide support to document significant changes including modifications and new improvements to the project from original CED document and list of permits obtained. GP! will provide final project plans. Assumptions: The following assumptions are in addition to those stated in the previous activity descriptions for this task order: ¢ Modifications will not be required to the existing roadway profile or roadway cross slopes. ¢ Full depth pavement and/or pavement resurfacing will be limited to the narrow strips of pavement removal and replacement necessary to install the proposed curb and ADA ramps. ¢ Drainage design is limited to resolving issues at curb ramps, relocated curbs, curb extensions and cross walks. Analysis of existing drainage systems and the correction of existing drainage issues is excluded from this scope. e Final design CADD drawings and design will be produced in AutoCAD/C3D format. ¢ BEPR advised that a Cultural Resource Study Phase IA will not be necessary for this project and all SHPO coordination has been completed. ¢ BEPR advised that a Threatened and Endangered species survey will not be necessary and all USFWS coordination has been completed. e Green Acres coordination, if required, will be conducted by NIDOT BEPR and NJDEP ° Hazardous waste investigations and studies, if necessary, are to be performed by NJDOT BEPR and therefore not included in this scope of services. ¢ Environmental mitigation is not anticipated and therefore not included in this scope of services. e Changes to the NJDEP Flood Hazard Area Control Act and NJDEP Freshwater Wetlands Protection Act Rules could affect the project scope and effort. Cost Estimate — A copy of the proposed costs for the aforementioned services is attached. We would be happy to discuss this scope of services with you, at your convenience. Thank you for the Opportunity to provide professional engineering design services to the Township of West Orange. Sincerely, Greenman-Pedersen, Inc. ZOE. “_ Andrew Cangiano, P.E. Director of Engineering / Vice President GPI
File revisions (1)
- Sep 29, 2026
18b58046b1c98,260,764 bytes