Supporting Documentation · Sep 30, 2025
215-25 Exhibits - NJDOT_GPI.pdf
18b58046b1c9c1d936d6cba6f99d6d50d0ac39002a44186ca481550e144e6d76Indexed text · page 17
Show all pagesExhibit A Page 14 of 23 TOWNSHIP OF WEST ORANGE Final Design West Orange, Washington Street TAP 2020 Design Assistance West Orange, Essex County, NJ PROJECT DESCRIPTION Malick & Scherer, PC (M&S) will assist GPI in the Final Design Phase for the Streetscape Improvement of Washington Street, located in West Orange Township, Essex County, NJ. M&S will be responsible for the preparation of the survey and base mapping documents. The project limits will extend along Washington Street its intersection with Main Street to approximately 100 feet SE of High Street, for a total of approximately 1,150 linear with a swath up to approximately 10 feet beyond the ROW or building face where noted. Additionally, the side streets will be surveyed for approximately 100 feet from the centerline intersection with Washington Street as shown on the sketch below. Conventional ground survey will be performed within these limits. A Drainage & Sanitary Survey will be performed, and will include pipe sizes and material, and inverts will be measured during this phase. The following is a detailed description of tasks to be performed by M&S, broken into Activity numbers as described under the NJDOT Capital Project Delivery Process: SURVEY & BASE MAPPING Survey services will be performed by Malick and Scherer, P.C. (M&S). To perform the existing conventional ground field survey along the existing roadway corridor within the project limits, it is assumed that a temporary shadow vehicle or local police/flagman may be required to protect the survey crew and safely maintain the flow of traffic. For the purpose of this proposal, it is assumed that these temporary lane interruptions, if required, will be permitted by the County and the Township between 9:00 am - 3:00 pm Mon-Fri. TASK 4215 — Conduct Supplemental Surveys Base mapping was prepared by M&S during the Preliminary Engineering phase of this project. Additional Topographic ground survey is anticipated during the Final Design phase for specific identified areas as requested by GPI. The survey work, data and information will be processed, compiled, and incorporated into the existing base mapping and Digital Terrain Model (DTM). Washington Street Streetscape TAP 2020 Page | |
File revisions (1)
- Sep 29, 2026
18b58046b1c98,260,764 bytes