Supporting Documentation · Sep 30, 2025
215-25 Exhibits - NJDOT_GPI.pdf
18b58046b1c9c1d936d6cba6f99d6d50d0ac39002a44186ca481550e144e6d76Indexed text · page 8
Show all pagesExhibit A Page 5 of 23 Zayibeth Carballo, PE, Township Engineer May 16, 2025 Township of West Orange Revised June 25, 2025 Scope of Services GPI will perform the activities as described within this scope of services. It is understood that these activities will be directed by the Township of West Orange. The activities are more specifically described as follows: Project Management: Scope Development, Budget, Schedule, and Invoicing — GP1 will prepare and submit to the Township a baseline schedule in an agreed upon format for approval or comment. We will update the schedule ona monthly basis for the duration of this project. GPI will submit a progress report with each invoice that will detail the following: Activities completed to date with the current invoice period highlighted Asummary of the costs incurred to date and the percentage of project complete Confirmation of upcoming submittals and possible scheduling conflicts Any unanticipated cost and/or activities not included in these scope of services Responses required from the Township or NJDOT Local Aid Anticipated work during the next invoice period KAKA It is understood that the Township will not process any submitted invoices unless the above information is attached to the same. This activity will also include attending and preparing minutes of one (1) coordination meeting during FD development. FD is expected to be completed in twelve (12) months from notice to proceed. The following summarizes the activities associated with this scope of services based on the NJDOT Activity Descriptions Manual and as modified for this specific design assistance project that are to be performed by GP! and our subconsultants: Activity No. Activity Description 4050 Develop Alternatives of Accommodation 4085 Conduct Supplemental Subsurface Utility Engineering 4090 Incorporate Utility Design in Contract Documents 4100 Prepare Jurisdictional Limits Maps and Agreements 4210 Complete Horizontal / Vertical Geometry 4215 Conduct Supplemental Surveys 4220 Prepare Final Roadway Plans 4230 Complete Lighting Design 4240 Complete Traffic Signal, Signing and Striping Plans 4265 Complete Landscape Architectural Design 4270 Complete Drainage Design 4275 Develop Construction Cost Estimate 4280 Develop Specifications 4285 Develop Construction Schedule 4290 Prepare Final Design Submission Package 4385 Prepare
ign 4270 Complete Drainage Design 4275 Develop Construction Cost Estimate 4280 Develop Specifications 4285 Develop Construction Schedule 4290 Prepare Final Design Submission Package 4385 Prepare Permit Application 4390 Review & Submit Permit Application GPI
File revisions (1)
- Sep 29, 2026
18b58046b1c98,260,764 bytes