Supporting Documentation · Oct 28, 2025
238-25 Exhibit B.pdf
a4503fcfe43dc056c2097c0433422c4e27b28d3c089366affeb870d79d7d9bf5Indexed text · page 103
Show all pagesShovels and/or any other equipment as necessary to perform snow removal services in this contract. SNOW PLOWING, REMOVAL AND SALTING: Sidewalks, Paths, Crosswalks, Sus Shelters and Stops Time for payment for.snow plowing, removal and salting services will start when the contractor's equipment and personnel arrive at the Public Works Building at 25 Lakeside Avenue. Time will cease when released by the Superintendent of Public Works or his designee. No traveling time will be paid between the contractor's site and the Public Works Building. The contractor must notify the Superintendent or his designee prior to leaving the route for any reason. No fuel or equipment will be supplied, Time for payment will not include down time due to fallure of contractor’s equipment, rest breaks, or meals. No repairs will be made by Township employees, The Township will not be responsible for any damage to the contractor's property. . Sait will be supplied by the Township. Sidewal Event snowfall amount Time allowed to clear all locations after snow ceases Up to 4 inches 4 hours 4 inches to 8 inches 6 hours & inches to 12 inches B.hours 12 inches to 18 Inches 12 hours Over 18 inches 24 hours The contractor will be compensated a minimum of 4 hours for equipment and personnel at the hourly rates bid for the equipment and personnel assigned plus a jump sum amount for final cleanup dependent upon the amount of snow per the above schedule and as bid all in the proposal. SALTING: FOR OPTION 1 AND 2 The Township will provide and load salt for the operations covered under this proposal from either the Public Works Building, 25 Lakeside Avenue or the Environmental and Recycling Center, 590 Mt. Pleasant Avenue. The Superintendent of Pablic Works or his designee will direct the contractors on the use of salt throughout the entire snow/ice event including pre salting and post event salting. CALCIUM CHLORIDE: FOR OPTION 3 This will need to be provided by the vendor and should be calculated in your bid, ~ Calcium chloride in pellet form: purity (e.g., 93% minimum assay for pellets) 40
File revisions (1)
- Sep 29, 2026
a4503fcfe43d9,721,822 bytes