Supporting Documentation · Oct 28, 2025
238-25 Exhibit B.pdf
Preserved file SHA-256
a4503fcfe43dc056c2097c0433422c4e27b28d3c089366affeb870d79d7d9bf5Indexed text · page 38
Show all pages30. The contractor shall be responsible for repalring all damage caused by the operation of his/her equipment ' during the performance of this contract, This includes but fs not limited to curbs, sidewaiks, lawn areas, driveways, mailboxes and road pavement. All damage shall be corrected by May 1, 2025 and each subsequent May 1 If the contract Is extended, 7 t 43
File revisions (1)
- Sep 29, 2026
a4503fcfe43d9,721,822 bytes