Supporting Documentation · Oct 28, 2025
238-25 Exhibit B.pdf
Preserved file SHA-256
a4503fcfe43dc056c2097c0433422c4e27b28d3c089366affeb870d79d7d9bf5Indexed text · page 49
Show all pages8. Any damage will be the contractor's responsibility to repair as soon as possible or no later than May 1°, 2026, and if awarded for 2027 and 2028. ALL INFORMATION FOR SIDEWALKS, PATHS, CROSSWALKS, BUS STOPS AND SHELTERS AND MAPS ARE LISTED. SEPARATELY AS APPENDIX A 54
File revisions (1)
- Sep 29, 2026
a4503fcfe43d9,721,822 bytes