Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Oct 28, 2025

238-25 Exhibit B.pdf

Preserved file SHA-256a4503fcfe43dc056c2097c0433422c4e27b28d3c089366affeb870d79d7d9bf5

Indexed text · page 83

Show all pages
Page 83

30, The contractor shall be responsible for repairing all damage caused by the operation of his/her equipment during the performance of this contract. This Includes but is not limited to curbs, sidewalks, lawn areas, driveways, mailboxes and road pavement. All damage shall be corrected by May 1, 2025 and each subsequent May 1 if the contract is extended. . 43

File revisions (1)