Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 24, 2025

244-25 Combine Consultants RFPs_compressed.pdf

Preserved file SHA-256e02accfc0652ac90a8dc4dd9fbfa6ce96a7fb031eb98c1714389417f46dd067d

Indexed text · page 23

Show all pages
Page 23

One Lake Street Park Upper Saddle River, New Jersey (Bergen County) CLIENT Borough of Upper Saddle River 376 W. Saddle River Road Upper Saddle River, New Jersey 07458 CONTACT Theodore Preusch Borough Administrator 201-327-2196 CONSTRUCTION COST $7.8 million COMPLETION DATE 2023 DISCIPLINES INCLUDED Design Survey Drainage Park Layout Electrical Synthetic Turf Design Stormwater Design Permitting Construction Management Boswell was engaged by the Borough of Upper Saddle River to provide design, electrical, utility coordination, survey, permitting, and construction inspection services for the development of a 9-acre piece of property into a sprawling multiuse athletic complex. The scope of work included construction of over 150,000 SF of synthetic turf and various associated recreation amenities including bleachers, dugouts, scoreboards, backstops, a multi-use field house building, pedestrian and vehicle lighting, sports field lighting, EV charger make-ready infrastructure, and various other amenities. This project also included the design and construction of a new access drive, parking facilities, pickleball courts, a perimeter walking circuit, ball safety netting, significant earthwork and retaining wall construction, landscaping, and stormwater improvements. Although the site is developed on top of a large hill, the project provides handicap accessibility in accordance with the Americans with Disabilities Act (ADA) standards.

File revisions (1)