Supporting Documentation · Nov 24, 2025
244-25 Combine Consultants RFPs_compressed.pdf
e02accfc0652ac90a8dc4dd9fbfa6ce96a7fb031eb98c1714389417f46dd067dIndexed text · page 40
Show all pagesBruce M. Rockwell, P.E. Vice President Power & Energy Engineering & Design Services YEARS OF EXPERIENCE: 43 Years EDUCATION: BSEE, Newark College of Engineering (NJIT) MBA, Monmouth University REGISTRATION: Professional Engineer: Fifty-One U.S. Jurisdictions Certified Power Quality Professional (CPQ) – Association of Energy Engineers Certified Co-Generation Professional (CCP) – Association of Energy Engineers (Inactive) Continuing Education Provider (ECSP) – NJ EC Board – Instructor #174; Sponsor #191 Certified Electrical Safety Compliance Professional (CESCP) – National Fire Protection Association EXPERIENCE: Bruce Rockwell, with more than 40 years of in-depth experience in the energy sector, serves as the Vice President of Boswell Engineering’s Power & Energy Design Division. His myriad of experience includes electrical transmission and distribution, HV substation design and field operations, power plants and railroads mission critical, and industrial facilities. Mr. Rockwell’s experience further includes engagements as an Engineering Expert, Engineering Expert Witness, Peer Reviewer, Owner’s Engineer, Oversight Engineer, Insurance Claim Support, Staff Augmentation Manager, and Electrical Inspector. Relevant project experience includes: • NJ TRANSIT: Design Build Project Lead: Replacement of (161) 69 kV Circuit Breakers at (16) Substations on the Morris & Essex Rail Line. • TC Electric / Judlau: Commissioning Engineer: Thirty-three (33) Mile Replacement and Cutover of • PSEG: Principal Engineer / Program Manager: Developed Substation Condition Assessment • BG&E: Owner’s Engineer: Review of New 115 kV GIS Substation Design. • BG&E: Owner’s Engineer: Review of New 230 kV GIS Substation Design. • BG&E: Prepare Owner’s Detailed Construction Cost Estimate for 115 - 230 kV Substation including • NJ TRANSIT: Damage Assessment: Provide site inspection and repair/replacement • NJ TRANSIT: Arc Flash Hazard Analysis: Perform Gap Assessment of Bus and Rail Facilities. Merck the Hudson Rail Line - Signal Power Distribution System. Program. Led the Execution of Assessments at (25) Substations. 60 MVA STATCOM recommendations for 69 kV Traction Power Substation and 2.4 kV Signal Substation that suffered extensive damage during a storm event. Design Build Project Lead: Replace T9-2 Transformer, 10 MVA, 34.5 - 4.16 kV • LIRR: Design Lead: Install
Substation and 2.4 kV Signal Substation that suffered extensive damage during a storm event. Design Build Project Lead: Replace T9-2 Transformer, 10 MVA, 34.5 - 4.16 kV • LIRR: Design Lead: Install Temporary Metering for Simultaneously Measuring Load Demand at (35) Traction Power Rectifier Substations. • Columbia University: Protection & Coordination Study for Manhattanville Campus - 13 kV Medium Voltage Power System 1
File revisions (1)
- Sep 29, 2026
e02accfc06524,309,945 bytes