Supporting Documentation · Nov 24, 2025
244-25 Combine Consultants RFPs_compressed.pdf
e02accfc0652ac90a8dc4dd9fbfa6ce96a7fb031eb98c1714389417f46dd067dIndexed text · page 57
Show all pagesO’Connor Memorial Park Reconstruction Project H. Coordinate light fixture replacement with Musco Lighting. I. Prepare Hudson-Essex-Passaic Soil Conservation District application forms. J. Plan Set is anticipated to include but not limited to: (1) Cover Sheet (2) General Notes and Legends (3) Existing Conditions/Survey Control Plan (4) Demolition / Site Preparation Plan (5) Site Plan (6) Grading and Utility Plan (7) Lighting Upgrade Plan and Details (8) Soil Erosion and Sediment Control Plan and Details (9) Construction Details K. Prepare Technical Specifications. 2A. Alternate B – Handball Wall Replacement: A. Coordinate with GPI’s geotechnical subconsultant for the performance of four (4) soil borings to a depth of 10 feet, or to bedrock, in the area of the handball wall and for the preparation of a report recommending soil bearing capacity values to be used in the structural design of the replacement wall. This is an estimated total of 40 linear feet of borings with soil samples taken at each 5-foot interval of depth. Additional samples may be taken as required. The actual depth and number of borings may be varied as ground conditions require. Normal precautions will be exercised during the field work to minimize disturbance to the ground surface. Bore holes will be grouted and patched with concrete. B. GPI will perform structural design calculations and prepare additional construction drawings for the construction of a replacement handball wall. The replacement wall is anticipated to be comprised of a reinforced concrete stem wall with concrete spread footing. GPI will prepare preliminary wall design calculations to determine the wall dimensions and required reinforcement for Township review. We will also prepare construction drawings for the proposed wall that will include all necessary details and notes required for a contractor to perform the work. We will prepare the following: C. Prepare construction details and specifications of replacement wall. 3. Construction Administration Services: GPI will provide the Township with full time technical support during the bidding and construction process. GPI will provide, at a minimum, the following Construction Administrative services based upon an assumed 7-week construction period: A. Bidding Services: (1) Preparation of the Notice to Bidders for the Township Purchasing Agent for publication. (2)
struction Administrative services based upon an assumed 7-week construction period: A. Bidding Services: (1) Preparation of the Notice to Bidders for the Township Purchasing Agent for publication. (2) Respond to bidders questions and issue addendums/clarifications as required. (3) Attend Bid opening. (4) Obtain, tabulate, and evaluate submitted Bids.
File revisions (1)
- Sep 29, 2026
e02accfc06524,309,945 bytes