Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Nov 24, 2025

244-25 Combine Consultants RFPs_compressed.pdf

Preserved file SHA-256e02accfc0652ac90a8dc4dd9fbfa6ce96a7fb031eb98c1714389417f46dd067d

Indexed text · page 82

Show all pages
Page 82

Project Schedule & Fee Proposal Project Schedule PS&S anticipates the following project schedule based on the scope of work outlined above and the anticipated requirements based on relevant project experience: Phase Duration Anticipated Timeline PHASE 1 – TOPOGRAPHIC SURVEY 3 weeks Month 0 – 1 PHASE 2 – PRELIMINARY DESIGN 8 weeks Month 1 – 3 PHASE 3 – FINAL DESIGN & BID SUPPORT 12 weeks Month 3 – 5 PHASE 4 – CONSTRUCTION ADMINISTRATION 3 months Months 6 – 9 Fee Proposal PS&S proposes to provide the consulting services described above for the following lump sum fees, broken out by Design Phase Services and Construction Administration and Inspection Services: Design Phase Services Fee PHASE 1 – Topographic Survey $6,000 PHASE 2 & 3 – Preliminary & Final Design $71,000 SUBTOTAL – DESIGN PHASE SERVICES: Add/ Alt - Design Phase Services PHASE 2 & 3 – GI Stormwater Management Design & Geotechnical $77,000 Fee $27,200 Note: The add alternate fee includes Green Infrastructure stormwater management design and supporting geotechnical services as described in the Stormwater Management Design Strategy under Phase 3 – Final Design. Construction Admin & Full-Time Inspection Services PHASE 4a – Construction Admin with Full-Time Inspection Services Fee $112,000 Note: Full-Time Inspection Services are based on one (1) inspector, working 8 hours per day, 5 days per week throughout the anticipated three-month construction period. Add/Alt - Construction Admin & Part-Time Inspection Services Fee PHASE 4b – Construction Admin with Part-Time Inspection Services $68,000 Note: Part-Time Inspection Services are based on one (1) inspector, working 8 hours per day, 2 days per week throughout the anticipated three-month construction period. Township of West Orange O’Connor Memorial Park Reconstruction Project October 10, 2025

File revisions (1)