Show all pages13. 14. a5. 16. Ti. be strictly enforced. The Contractor shall make his own arrangements for obtaining the electrical energy and a water supply necessary for construction purposes. PUBLIC SAFEGUARDS The Contractor agrees to conduct the work at all times in such a manner that public travel shall not be inconvenienced needlessly, nor shall it be wholly obstructed at any point. He further agrees to be responsible for all legal notices and signals to the public of the state of the roads while the work is in progress, providing watchmen, barricades, red lights, danger and warning signs and such other precautions necessary to protect life and property in accordance with the "Manual on Uniform Traffic Control Devices". STORAGE OF MATERIALS Materials shall be stored so as to insure the preservation of their quality and fitness for the work. When considered necessary, they shall be placed on wood platforms and covered, or stored in a suitable building as directed by the Engineer. Stored material shall be located so as to facilitate prompt inspection. BARRIERS The Contractor will be responsible for the satisfactory repair and maintenance of all fences, walls, driveways, barriers crossed or damaged by him during the course of construction. PROPERTY MARKERS DISTURBED The Contractor shall, at his own expense, retain the services of a licensed surveyor to replace property markers on or adjacent to privately owned property which have been disturbed during the course of construction. COOPERATION WITH UTILITIES It shall be the responsibility of the Contractor to arrange for all utility work essential for the completion of the project and to coordinate the work carried on by public utilities with his own work in order to eliminate delay of the project. The Contractor shall cooperate with the utility company in the removal, relocation and replacement of such structures. Wherever underground utilities are encountered, the Contractor shall take special precautions to prevent breakage and interruption of service. Where such lines require relocation before the work can proceed, the UTILITY COMPANY shall be promptly notified of the fact and will relocate such lines. It shall also be the Contractor's responsibility to assure that any work done by public utilities or their contractors is in conformity with the Plans and Specifications for the project. No compensation
shall also be the Contractor's responsibility to assure that any work done by public utilities or their contractors is in conformity with the Plans and Specifications for the project. No compensation or extension of contract time GR-4
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes