Show all pagesmaintenance of traffic requirements of the Contract. An extension of time may, however, be granted if appropriate under subsection 108.11. 107.11.02 General Insurance. THIS SUBPART IS REPLACED BY THE FOLLOWING: REFER TO THE FRONT END OF THESE SPECIFICATIONS FOR GENERAL INSURANCE REQUIREMENTS. 107.14 Patented Devices, Materials, and Processes THE SECOND PARAGRAPH IS DELETED. SECTION 108 — PROSECUTION AND COMPLETION 408.02 COMMENCEMENT OF WORK THE SECOND PARAGRAPH IS REPLACED WITH THE FOLLOWING: Provide written notice to the contact provided in 101.04 of the date when construction operations will begin. Do not begin construction operations before the date provided and the receipt of the Notice to Proceed. THE SEVENTH PARAGRAPH IS REPLACED WITH THE FOLLOWING: The Contractor is not entitled to payment or an extension of Contract Time for any delay, hindrance, or interference before the first day of Contract Time. 108.04 WORK SITE AND STORAGE THE FOLLOWING IS ADDED: Private property shall not be used for storage purposes without written permission of the owner or lessee, and any other approvals, including those as specified in 107.01.02. Copies of such written permission shall be furnished to the RE before storage. Materials shall be stored to ensure the preservation of their quality and fitness. Stored materials, even though approved before storage, may again be inspected before their use on the Project. Stored materials shall be located so as to facilitate their prompt inspection. With the approval of the RE, portions of the ROW may be used for storage purposes and for the placing of the Contractor's plant and equipment, but any additional space must be provided by the Contractor at the Contractor's expense. Equipment and materials shall be placed behind traffic control devices, or stored more than 30 feet from the traveled way. Furnishing, placing, and removing the traffic control devices shall be at no Additional Compensation. No materials shall be stored within restricted areas noted on the plans or in regulated environmental areas. 108.07 TRAFFIC CONTROL 108.07.01 Interference THE SIXTH PARAGRAPH IS DELETED AND REPLACED WITH THE FOLLOWING: The Contractor agrees that he shall have no right to nor shall he make any claim whatsoever for damage or additional compensation by reason of the engineer revising the stage construction or the
ING: The Contractor agrees that he shall have no right to nor shall he make any claim whatsoever for damage or additional compensation by reason of the engineer revising the stage construction or the maintenance of traffic requirements of the Contract. An extension of time may, however, be granted if appropriate under subsection 108.11. THE FOLLOWING IS ADDED: The contractor is responsible for coordinating all traffic control operations with the police department. Work which will interfere with traffic or restrict the width of traveled way available for traffic shall not be performed on Saturdays, Sundays, or Legal Holidays unless approved by the RE.
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes