Town CrierWest Orange, New Jersey
← Back to search

Supporting Documentation · Jul 7, 2026

180-26 - Exhibit A. CDBG 2025 SPECS_compressed.pdf

Preserved file SHA-256f1be2f8550e23ebed5ff30622162ea44faa0acfdce5ba7e002b53b3c8d2fc2be

Indexed text · page 118

Show all pages
Page 118

108.09 MAINTENANCE WITHIN THE PROJECT LIMITS THE FOLLOWING IS ADDED: Any damage to the Roadway due to the Contractor's operations shall be repaired at no Additional Compensation, except as specified in 107.11. The Contractor shall complete within 24 hours specific repairs directed by the RE, except where the requirements are specified elsewhere. Nothing in this Subsection shall be construed to limit or change the risks assumed by the Contractor as specified in 107.11.01. 108.10 CONTRACT TIME THE SECOND PARAGRAPH IS DELETED: THE FOLLOWING IS ADDED: The entire work of the project shall be completed within 60 calendar days. 108.14 DEFAULT AND TERMINATION OF CONTRACTOR'S RIGHT TO PROCEED THE FOLLOWING SUBPARTS UNDER THE FIRST PARAGRAPH ARE CHANGED TO: 1. Fails to submit the required contract documents as outlined in Section 108.02 within 30 calendar days of the start of Contract Time OR fails to begin construction operations within 21 calendar days of the scheduled start date/Notice to Proceed. 108.16 PARTIAL ACCEPTANCE THE PROVISIONS OF THIS SECTION ARE DELETED FROM THIS CONTRACT. 108.18 SUBSTANTIAL COMPLETION REPLACE THIS SUBSECTION WITH THE FOLLOWING: The Contractor will provide written notice to the RE when the Work is substantially complete. Upon notice the RE will arrange for inspection by the Township. If the inspection indicates that the Work is not substantially completed the RE will respond within 14 days and provide the Contractor with the ‘punch-list’ and necessary instructions for completicn and correction. Upon completion and correction of the Work, the Contractor will again notify the RE that the work is substantially complete and the RE will perform another inspection. Repeat this procedure until the Work on the project site is determined to be substantially completed by the RE. 108.19 COMPLETION AND ACCEPTANCE REPLACE THIS SUBSECTION WITH THE FOLLOWING: The Contractor will provide written notice to the RE when the Work is complete. Upon notice the RE will notify the Township for concurrence of completion of all work items to the satisfaction of the Township requirements. If the Township determines that the Work is not complete, the RE will respond within 14 days and provide the Contractor with the necessary instructions for completion and correction. Complete the Work to gain the acceptance of the Township as communicated through the

Page 118

ll respond within 14 days and provide the Contractor with the necessary instructions for completion and correction. Complete the Work to gain the acceptance of the Township as communicated through the RE. Upon satisfaction of the RE that construction operations are complete and acceptable, the project will move to Township administration for processing of project completion documentation; this marks the Construction Operation Completion Date. The Contractor will work with Township administration to complete the required documentation of bonds, lien releases, change orders, warrantees, and other documentation as required herein, see Section 109.11. 108.20 LIQUIDATED DAMAGES THE FOLLOWING IS ADDED:

File revisions (1)