Supporting Documentation · Jul 7, 2026
180-26 - Exhibit A. CDBG 2025 SPECS_compressed.pdf
f1be2f8550e23ebed5ff30622162ea44faa0acfdce5ba7e002b53b3c8d2fc2beIndexed text · page 120
Show all pagesDIVISION 150 —- CONTRACT REQUIREMENTS SECTION 151 - PERFORMANCE BOND AND PAYMENT BOND 151.04 MEASUREMENT AND PAYMENT THIS SUBSECTION IS CHANGED TO: The Township will measure and make payment for Items as follows: Item Pay Unit PERFORMANCE BOND AND PAYMENT BOND LUMP SUM SECTION 154 — MOBILIZATION 154.04 MEASUREMENT AND PAYMENT THIS SUBSECTION IS CHANGED TO: The Township will measure and make payment for Items as follows: Item Pay Unit MOBILIZATION LUMP SUM The Township will make payment for MOBILIZATION on a lump sum basis, regardless of the number of times the Contractor shuts down and returns to the Project. The Township will make payment as follows: Work Completed Payment 10% 50% 20% 75% 30% 98% This work shall include coordinating with the utility companies, municipal, county officials and residents. SECTION 157 — CONSTRUCTION LAYOUT AND MONUMENTS 157.03.01 Construction Layout THE FOURTH PARAGRAPH IS CHANGED TO: The Contractor shall perform layout for construction of the Contract by determining their own project control. Perform layout under the direct supervision of a licensed N.J. Land Surveyor. Preserve control points throughout the duration of the project. Reset control points that are damaged, lost, displaced, or removed. The Contractor shall also establish a project baseline which will be provided to the RE. THE FIFTH PARAGRAPH IS CHANGED TO: Before beginning construction operations, the Contractor's licensed surveyor shall establish the vertical and horizontal controls using, at minimum, third-order, Class | accuracy procedural standards and equipment. Provide the RE all survey notes and calculations related to the field control established. 11
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes