Show all pagesWhile Uniformed Officers are not anticipated, the Contractor is still responsible to coordinate all work with the West Orange Police Department. 159.03.08 Traffic Direction B. Police. THIS SECTION IS DELETED AND REPLACED WITH THE FOLLOWING: When local ordinance requires or as included in the plans, the pay item TRAFFIC DIRECTOR, POLICE shall be utilized indicating the use of local uniformed police officers. An allowance has been provided for in the contract proposal for the estimated hours that Police Traffic Directors will be required during this project. The use of Police Traffic Directors will be discussed at the pre- construction meeting with the RE, Contractor, and local Traffic Safety Officer present. The Contractor will take the lead in scheduling police traffic directors with the approval of the RE. The Contractor will submit invoices to the RE for approval and then payment against the TRAFFIC DIRECTOR, POLICE allowance. Itis the responsibility of the Contractor to notify the RE and police at least 24 hours in advance (or as required by the local Police Department) of cancelations or changes to work affecting the use of TRAFFIC DIRECTOR, POLICE. Improper notice will result in any expenses related to TRAFFIC DIRECTOR, POLICE to be subtracted from the Contractors invoices. 459.04 MEASUREMENT AND PAYMENT THIS SUBSECTION IS CHANGED TO: The Township will measure and make payment for Items as follows: Item Pay Unit BREAKAWAY BARRICADE UNIT DRUM UNIT TRAFFIC CONE UNIT CONSTRUCTION SIGNS SQUARE FOOT TRAFFIC DIRECTOR, POLICE DOLLAR There will be no separate measurement or payment for relocating traffic control devices as required or as directed. THE FOLLOWING IS ADDED: The Contractor will be reimbursed for the direct cost billed by the Police Department with no additional payments for overhead or profit. The Contractor shall provide invoices from the Police Department to the RE for reimbursement. An estimated amount to cover these reimbursements has been included in the proposal. It is the intent of the project that any improvements that disturb pedestrian traffic areas will be reconstructed immediately upon disturbance/demolition to minimize any disturbance to pedestrian sidewalks, access and crosswalks. Should any prolonged disturbance or delays be encountered during construction the contractor shall install Temporary Sidewalk as required or
disturbance to pedestrian sidewalks, access and crosswalks. Should any prolonged disturbance or delays be encountered during construction the contractor shall install Temporary Sidewalk as required or as directed by the engineer in areas of high pedestrian traffic. No separate or individual payment shall be made for Temporary Sidewalk. SECTION 160 — PRICE ADJUSTMENTS 160,.03.01 Fuel Price Adjustment THE FOLLOWING IS ADDED BEFORE THE FIRST PARAGRAPH: Fuel Price Adjustment will be reimbursable when deemed eligible by NJSA 40A:11-13. 14
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes