Supporting Documentation · Jul 7, 2026
180-26 - Exhibit A. CDBG 2025 SPECS_compressed.pdf
f1be2f8550e23ebed5ff30622162ea44faa0acfdce5ba7e002b53b3c8d2fc2beIndexed text · page 148
Show all pagesSECTION 609 — BEAM GUIDE RAIL 609.01 DESCRIPTION This Section describes the requirements for installing, resetting, or removing beam guide rail. 609.02 MATERIALS Provide materials as specified: Concrete... Reinforcement Steel Adhesive Anchor System 908.01.04 Flexible Delineators.. - 911.03 Rail Element... 913.01.01 End Treatment 913,01.02 Posts... .913,01.03 Blockouts -913.01.03 Rub Rail .. .913.01.04 Miscellaneous Hardware 913.01.05 609.03 CONSTRUCTION 609.03.01 Beam Guide Rail Install beam guide rail, single or dual faced, so that no unprotected end is exposed to approaching traffic. Within the same working day, replace all existing beam guide rail or cable guide rail that is removed. Where possible, install new beam guide rail exposed to approaching traffic before the removal of the existing system. Before driving or mounting the posts, determine the location of utilities that may conflict with the posts. The Contractor may adjust post spacing by 6 inches, as approved, to eliminate such conflicts. After completing the wiring for each electrical system and before making connections, perform the following tests on each circuit using suitable equipment in the presence of the RE: 1. Tests for continuity. 2. Tests for ground. 3. Tests for insulation resistance between circuit wires and from circuit wires to ground. Verify that the insulation resistance is at least 150 megaohms between conductors, or between conductor and ground for circuits with a total single conductor length of 1,500 feet or more, and at least 175 megaohms for circuits with a total single conductor length of less than 1,500 feet. The RE may require additional tests if it is suspected that conduit have been damaged. Locate and repair damage to the electrical conduit due to construction operations. Drive beam guide rail posts to the required position. Ensure that posts are driven plumb, properly spaced, and to the line and grade shown. Attach the beam guide rail element to the blockout at every post. Align the top edge of the beam guide rail element in a straight line or smooth curve, parallel to, or concentric with, the traveled way. Where a vertical transition is required, ensure that the top edge of the beam guide rail element forms the chords of a smooth vertical curve. If adjustments to the rail element are necessary, obtain RE approval before punching, drilling, or reaming
that the top edge of the beam guide rail element forms the chords of a smooth vertical curve. If adjustments to the rail element are necessary, obtain RE approval before punching, drilling, or reaming of the rail element. Do not cut or weld the rail element. Install flexible delineators with white retroreflective sheeting on the right side of the direction of traffic. Install flexible delineators with yellow retroreflective sheeting on the left side of the direction of traffic. Mount flexible delineators on the blackout of beam guide rail using either a “U" channel base on the I-beam blockout or a flat base attached to a wood timber or synthetic routed blockout. Attach the base to the I-beam, wood timber blockout, or synthetic routed 39
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes