Supporting Documentation · Jul 7, 2026
180-26 - Exhibit A. CDBG 2025 SPECS_compressed.pdf
Preserved file SHA-256
f1be2f8550e23ebed5ff30622162ea44faa0acfdce5ba7e002b53b3c8d2fc2beIndexed text · page 154
Show all pagesSECTION 653 — GAS 653.01 DESCRIPTION THE FOLLOWING IS ADDED: The Contractor shall coordinate all work with the local utility authority. The utility company is responsible for all inspection and testing. Separate payment shall not be made for Reset Gas Valve Box. Shall be included under Hot Mix Asphalt 9.5M64 Surface Course, 2” Thick. 45
File revisions (1)
- Sep 29, 2026
f1be2f8550e262,114,848 bytes