Supporting Documentation · Nov 10, 2026
296-26 Rak Plumbing and Heating, LLC - Proposal.pdf
924ad4c3bbc2c80a28c00310f59a3a69853984d82c42edde3cf8419f2e57bed6Indexed text · page 3
Show all pagesProduct/Service Description Qty. Unit Price Total Labor / Exempt Not included: -Tree repair/replacement and any landscaping repairs -Any unmarked utilities that may become damaged during excavation -If the pump pit specced in infeasable, to be determined by camera inspection, any change of scope of work will be re-evaluated at the video inspection/locating -Replacing the sewer line from the property to the street manhole -Any preexisting sewer conditions that exist in the sewer line from the house to the new pit, that may need to be repaired, will be additional -Asphalt repairs -Any additional work not listed above will be done at an additional cost -Complete replacement of asphalt driveway 1 $0.00 $0.00* Labor / Exempt CO - OP Resolution #0417-24 #CK-04-BERGEN #11-BeCCP Vendor#26672 1 $0.00 $0.00* * Non-taxable Total $75,800.00 This quote is valid for the next 10 days, after which values may be subject to change. Disclosure: - Demolition of existing plumbing/heating to be done by others. - All garbage produced by our firm will be disposed to an on-site dumpster provided by others. - Shower to be prepitched by others. - All fixtures to be supplied by others & received/inspected for damages by the person purchasing the fixtures. - Bathroom layout to be determined by the GC with the homeowner. - Dryer vent to be rough in by others, and dryer to be connected by others. - Roof penetrations to be flashed by others. - Blocking for pedestal sinks, wall mounted sinks, grab bars, or any other wall mounted fixtures shall be installed by others. - All digging, cutting and opening of walls/floors, and patching of walls/floors to be done by others. - Any work not included in this contract scope, will be done at an additional cost once a signed change order has been received. - Change orders shall be paid in full upon completion of the extra scope of work. New construction project payment schedule (Not applicable to change orders, repairs, or service calls) *Payments to be 40% deposit received before any work begins, an additional 30% within 3 days after rough inspection is passed, and the final 30% after final inspection is passed within 3 days - Any portion of any fee or other amount payable hereunder that is not paid within 30 days when due will accrue interest at one and one-half percent (1.5%) per month or the maximum rate permitted by applicable law, whichever is
other amount payable hereunder that is not paid within 30 days when due will accrue interest at one and one-half percent (1.5%) per month or the maximum rate permitted by applicable law, whichever is less, from the due date until paid. 3 of 4 pagesRak Plumbing and Heating, LLC 60 Carlton Avenue | East Rutherford, New Jersey 07073 +1 973-309-0523 | Rak.plumbing.heating@gmail.com
File revisions (1)
- Nov 7, 2026
924ad4c3bbc240,455 bytes