Town CrierWest Orange, New Jersey
← Back to search

Packet · Aug 21, 2012

Conference/Public Meeting Agendas/Documents — Packet

Preserved file SHA-256d5133f2a8122b0ddefaa9f83af0a2a3d1477618a2cef3f52ee67e15f2d6144f5

Indexed text · page 16

Show all pages
Page 16

” August 21, 2012 RESOLUTION WHEREAS, the Township owns property commonly known as 55-57 Ridgeway Avenue and known as Block.258, Lot 38 on'the Assessment Maps of the Township of West Orange (the “Property”); and WHEREAS, the Township desires 10 consider the developmant of a passive neighborhood park” with ragard to the Property; and “WHEREAS, the Mayor and Director of Planning. have mat with numerous residents-coneérning -- os this potential Improverient to the Property; and WHEREAS, the feetures may include new pedestrian paths, pedastrian entrances‘at Ridgeway... Avenue, Arverne Road, and Highland Boulevard and additional fencing, landscaping and stonewall. .. reconstruction; ant “WHEREAS, “the “Township. ratalnad ‘the firm of -Barreto/Dowd .of Howell, New. Jatéqy.cby- Resolution No. “122-12, tleted May 29, .2012-t0-ptovide professional design services for a “fee ‘not to - : exceed $25,000.00 which included Design Development, Construction Design end Bid Docimerrts, Bidding Pariod Services and Construction Phase Services; and WHEREAS, the Design Development Phase was prepared using existing property survey ° information; and WHEREAS, to prepare Construction Design and Bid Documents a detafled property boundary, tocation and topographi; survey is needed which jacatas all site features within the property, including trees and the stone will, sets permanent markings at all property cornars and provides topmgraphic Information ingluding ong foot contours thraughout the parcel and spot elevations at key jocations; and WHEREAS, the Engineering Division prepared specifications for the boundary, location and topographic survey and solickted propossls from four fitms capable of providing the professional land surveying services outlined inthe specifications; and . a WHEREAS, the firm of Suburban Consulting Engineers, 100-Vallay Road, Suite 202, Mt, Arlingtan, New Jersey 07856 sulymitted the lowest proposal detwd August 1, 2012 in the amount of 36,265.00; and © WHEREAS, the Proposal of Suburban Consulting Engineers was reviewed by the Township Engineer and he detarmined tt camplied with the specifications; and : WHEREAS, sufficient funds exist in the Capital Budget for this work; and ? WHEREAS, the Township Council cancurs in the foragoing. NOW, BE IT HEREBY RESOLVED, by the Township Counctl of the Township of West Orange that the Township be and

Page 16

Capital Budget for this work; and ? WHEREAS, the Township Council cancurs in the foragoing. NOW, BE IT HEREBY RESOLVED, by the Township Counctl of the Township of West Orange that the Township be and is hereby authorlzed to enter int @ Professional Services Contract with Suburban Consulting Engineers, 109 Valley Read, Suite 202, Mt. Arlington, New Jersey 07856 in an amount nat to exceed $8,500.00 which includes the bid of $6,265.00 and $235.00 for reimbursable expenses which funds shall be paid for from the Capltal Budget for Design-Ridgewsy Avenue for Professional Land Surveying Services in accordance with their proposal dated August 1, 2012. Resolution #165-12

File revisions (1)