Page 128

PHASE 4 - CONSTRUCTION STAGE ITEM 1: Limited Construction Support Services Matrix will provide the following construction support activities during the duration of the construction project:  Attend one (1) pre-construction meeting  Provide drawings to the contractor for obtaining construction permits (3 sets) for the project. It is the contractor’s responsibility to file and obtain all construction permits for the project  Review contractors shop drawings. This includes review of up to one (1) resubmittal of a specific shop drawing  Review contractor’s application for payment  Provide full-time field observations which will include any progress site meetings during the construction of the project (4-week construction period as stated in the RFP)  Provide a punch list for the project If the project extends beyond the construction period described above or the Township requests additional site visits/meetings our office will provide a scope and fee for the additional time required for the project. FIXED FEE: $29,050.00 LIMITED DIRECT EXPENSES Direct expenses are an estimated cost which includes printing, postage (including certified notifications), travel, and other miscellaneous project-related costs. The amount may vary based on the additional requirements of the project and will be billed at the rates provided in this proposal. ESTIMATED FEE: $1,500.00 TOTAL FEE FOR PHASES 1, 2,3 AND DIRECT EXPENSES: $134,500.00 TOTAL FEE FOR PHASE 4: $29,050.00 ASSUMPTIONS AND EXCLUSIONS  All work areas are accessible.  NJDEP Green Acres Program submission or review is excluded  Costs assume that the work described above will be performed in Level D personal protective equipment (PPE)  Costs do not include any activities beyond what is included in this proposal.  This proposal does not include costs to retain an LSRP  Geotechnical investigation or reports  Site specific seismic evaluation  Construction oversight or inspection services beyond what is listed above  Application for any permits or approvals not specifically described above are excluded  Application fees are excluded 9

Page 129

 Any pavement cores, temporary or permanent wells, test pits, or test strips, if and as warranted or required  County or local planning board submissions are excluded  Traffic engineering is excluded  Preparation of a Phase I Environmental Site Assessment (ESA) is excluded  Structural engineering shall be limited to light pole and shade structure foundations and calculations CLOSING Any item listed above which is not ordered will not be billed. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs, mylar copies, certified mailings, photographs, blueprints, and special deliveries are considered additional to the proposal items unless specifically noted within the scope of this proposal. This proposal is submitted solely and exclusively for the use of the Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposal’s content to any third party without prior written authorization from Matrix is expressly prohibited. In addition to the specific items as listed herein, the client may be required to demonstrate compliance with certain permit and approval conditions as may be imposed by one or more of the regulatory agencies. These conditions may require revisions to the plans and/or preparation of additional supporting documentation. This proposal does not include these additional items unless specifically outlined within the scope of this proposal. 10

Page 130

SECTION 2 – KEY PERSONNEL ORGANIZATION CHART RESUMES

Page 131

Organization Chart Project Manager Phil Scott, PE Civil Engineering Surveying Evan Jacobs, PE, PP, CFM Sean Savage, PE Bert Wyness, PLS, CH Landscape Architecture Ecological/Regulatory MEP Engineering Bill Reimer, LLA, RLA Robert Fiorile Christopher Strunk, PE Township of West Orange| RFP | Oskar Schindler Performing Arts Center (OSPAC) and Crystal Lake Improvements

Page 132

PHILLIP SCOTT, PE, CME Project Manager Professional Qualifications Mr. Scott serves as a Senior Project Manager with over 24 years of experience in the public and private sectors. Mr. Scott was formerly the Director of Engineering at the City of Newark responsible to improve, maintain, plan, operate, and repair the City's infrastructure. He was responsible for improvements and enhancement of roadways, traffic and transportation, municipal parks, code enforcement and the office of the Uniform Construction Code. As Director of the Department of Engineering, Mr. Scott oversaw a staff of approximately 150 employees, managed a budget of over $14 million, was the Mayor’s voting representative on the Board of Trustees for the North Jersey Transportation Planning Authority (NJTPA), and served as the City’s flood administrator for FEMA. The majority of his experience has been associated with residential subdivisions and office/commercial site developments. He has extensive experience in urban revitalization and the redevelopment of affordable housing sites. Mr. Scott is also responsible for several large redevelopment projects in Newark and the surrounding municipalities. Professional Experience One Theatre Square, Newark, NJ - Project Manager for the development of NJPAC’s first major expansion since its opening in 1997. The project consists of the construction of a 22-story residential tower with over 250 rental apartment units, sub-station for the Newark Police Department, parking garage, and a streetscape with 20,000 sq. ft. of high-quality retail. EDUCATION B.S. Civil Engineering, New Jersey Institute of Technology, 1998 PROFESSIONAL REGISTRATIONS Professional Engineer – New Jersey, #24GE04417900, 2003 Certified Municipal Engineer – New Jersey, #04-37 PROFESSIONAL AFFILIATIONS Walter G. Alexander Redevelopment, City of Orange, NJ - Project American Society of Civil Engineers Manager for redevelopment project in the Central Orange Redevelopment New Jersey Society of Professional Plan area comprised of two phases – Family Housing and Senior Housing. Engineers The Family Housing component consists of the demolition of an existing highrise public housing building and is being replaced with 66 rental townhouse units and community space. The Senior Housing component consists of the demolition of an existing high-rise public housing building and is being replaced

Page 132

and is being replaced with 66 rental townhouse units and community space. The Senior Housing component consists of the demolition of an existing high-rise public housing building and is being replaced with 48 senior rental units in a single building that is designed to complement the adjacent townhouse development design from the previous phase of development. City of Newark, Passaic Tidal Coastal Risk Management Study, USACE - The U.S. Army Corps of Engineers, New York District is conducting a study in partnership with the NJDEP to evaluate potential coastal storm risk management measures for the tidally influenced and surge-prone areas in the lower Passaic and Hackensack Rivers, and Newark Bay, New Jersey that were included in the authorized Passaic Main Stem project. It includes portions of the City of Newark (Essex County), and its suburbs of Harrison and Kearny (Hudson County). US Army Corps of Engineers (Newark Flanking Plan + Minish Park). NEWARKGO, Shared Micromobility Pilot Project - Lead the development and creation of the City of Newark’s share program that has brought 2,000 bikes and e-scooters to all neighborhoods in the city. NewarkGO Shared Micromobility Pilot Project, Establishing Ordinance + Program rules and regulations. City of Newark, Small Cell Wireless Facility (5g) Ordinance and Regulations (Small Cell Coordinator) - Lead the development and creation of the City of Newark’s Small Cell Wireless Facility Permitting Process which included and not limited to, establishment and adoption of a Municipal Ordinance, adoption of a Wireless Telecommunications Facilities Manual and created a permitting process in accordance with FCC rules and orders. Small Cell Wireless Facility (5G) Regulations + Ordinance. A. Harry Moore Redevelopment, Jersey City, NJ - Project Manager for the phased redevelopment of a Jersey City Housing Authority site. The residential development comprised of five mid-rise buildings and associated parking.

Page 133

PHILLIP SCOTT, PE, CME Project Manager City of Newark, Stormwater Utility Fee Feasibility Study - Evaluating the City’s ability to create and implement New Jersey’s first stormwater utility designed to effectively manage and maintain Newark’s stormwater infrastructure, create a dedicated funding source to implement Best Management Practices, and identify and implement required activities to ensure State and Federal regulatory compliance. City of Newark Energy Savings Plan - Lead the City’s efforts to develop and implement a comprehensive Energy Savings Plan in seventeen of the most energy intensive public buildings with the goal of identifying and implementing cost-effective and creative solutions to reduce our municipal energy consumption by at least 20 percent. Newark Greenstreets Report - Feasibility study funded by the North Jersey Transportation Planning Authority, focused on assessing the City’s ability of installing green infrastructure systems within the public rights-of-way to help manage stormwater runoff during precipitation events, improve quality of life for City residents and complied with local, State, and Federal transportation regulations. Central Avenue Revitalization Streetscape, East Orange, NJ - Provided civil engineering design services for the revitalization of 4,800 linear feet of the Central Avenue Business Corridor. Designed and implemented streetscape concept plans, engineering drawings, and bid documents to complement the existing historical elements. Douglas Harrison Redevelopment, Newark, NJ - Project Manager for the design, permitting, and construction oversight of the outdated Douglas Harrison Homes in Newark’s Central Ward. The project proposes to construct “brownstone” style family rental units, a mid-rise senior building, and two public parks to be dedicated to Green Acres. Baxter Park South, Newark, NJ - Project Manager for the redevelopment of Baxter Terrace, a recently demolished low-income housing development owned and operated by the Newark Housing Authority. This project consists of the design, permitting, and construction administration of two 4-story mixed-use buildings with a total of 90 residential units, and ground floor retail space. Baxter Park South will be the first of many redevelopment projects in the City of Newark’s Broad Street Station Redevelopment Area. Montgomery Heights, Newark, NJ - Project Manager

Page 133

floor retail space. Baxter Park South will be the first of many redevelopment projects in the City of Newark’s Broad Street Station Redevelopment Area. Montgomery Heights, Newark, NJ - Project Manager for the first phase of the redevelopment of Brick Towers, a recently demolished property owned and operated by the Newark Housing Authority. The project consists of a 5story mixed-use building with 80 residential units, 9,700 SF of retail space, and 108 parking spaces. Alexander Hamilton Redevelopment, Paterson, NJ - Project Manager for progressive and ambitious rehabilitation of outdated urban housing authority project consisting of lower density townhouses and stacked townhouses for a total of 201 new units, including 32 for-sale homes; all homes will meet the COAH affordable housing guidelines. Lincoln Park Redevelopment, Newark, NJ - Project Manager for a mixed- use residential development comprised of 21 residential units, including seven live-work townhouses, an eight-unit condominium, and a six-unit loft condominium with a ground floor retail space. City View Landing, Newark, NJ - Project Manager for the redevelopment of a former public housing site that contained a mix of uses, including 58 rental units, 16 home ownership units, and a mid-rise building with 48 senior units and 3,000 SF of retail space. Trinitas Center of Regional Education (CORE), Elizabeth, NJ - Redevelopment of a 2.4-acre site with a twostory building and surface parking to provide emergency response, community, and medical education. Saint Michael’s Medical Center, Newark, NJ - Redevelopment of a 9-acre medical center to construct a new emergency department and main lobby entrances and parking.

Page 134

EVAN M. JACOBS, PE, PP, CFM Civil Engineer Professional Qualifications Evan Jacobs is a civil engineering project manager with 17 years of experience managing, designing and overseeing the construction of a multitude of land development projects. He is well-versed in all aspects of the design of public and private land development, site planning, grading and earthwork management, drainage and stormwater management, utility design, land use permitting, municipal board approvals and preparation of construction documents for public bidding. Mr. Jacobs’ projects have included a wide-range of sectors, including K-12 and higher education, sports and recreation facilities, multi-family residential developments, commercial and industrial sites, bridge and culvert replacements, utility infrastructure, largescale brownfield redevelopment sites, flood mitigation and prevention, and septic system design. Mr. Jacobs also brings nearly seven years’ experience as a municipal engineer and planner, having served multiple municipalities, handling all aspects of capital construction projects, apply for and securing grant opportunities, and representing the engineering and construction interests of the municipality. Mr. Jacobs also represented municipal land use boards as both a professional engineer and professional planner serving both Planning Boards and Zoning Boards of Adjustment. Mr. Jacobs has also provided expert witness testimony regarding engineering and land development in both County and Federal courtrooms. Professional Experience Oil/Water Separator Replacements, Public Service Electric & Gas Co. (PSE&G), Various NJ Locations - Project Manager and site/civil engineering lead responsible for the design and preparation of construction documents for replacement of oil/water separators at 23 PSE&G vehicle maintenance garages throughout the state. Additional responsibilities included full site investigation and design, existing utility and infrastructure mapping, local sewer authority permitting, plumbing and electrical design to support the new OWS as well as modifications to existing plumbing and sewer systems, grading and drainage design, bid support services, as well as municipal construction permits and sub-code permits for plumbing, electrical, and building. Pathside Museum Project, Jersey City, NJ – Project Manager and site/civil engineering lead responsible for

Page 134

s municipal construction permits and sub-code permits for plumbing, electrical, and building. Pathside Museum Project, Jersey City, NJ – Project Manager and site/civil engineering lead responsible for the design and preparation of construction documents for site improvements for the museum redevelopment of the existing Pathside Building in Journal Square, including a new loading dock berth, stormwater and utility infrastructure improvements, site and landscape improvements for an outdoor plaza and perimeter pedestrian areas, and ADA accessibility improvements. EDUCATION MS Civil Engineering, New Jersey Institute of Technology, May 2012 BS Civil Engineering, New Jersey Institute of Technology, May 2007 PROFESSIONAL REGISTRATIONS Professional Engineer – New Jersey (April 2012) Professional Planner – New Jersey (September 2017) PROFESSIONAL CERTIFICATIONS AND TRAINING Certified Floodplain Manager (Association of State Floodplain Managers), January 2020 HAZWOPER and OSHA 40-hour certification (initially licensed in March 2013, currently expired) PROFESSIONAL AFFILIATIONS Association of State Floodplain Managers, January 2020 Military Ocean Terminal at Bayonne Yard, Bayonne, NJ – Site/civil engineering lead responsible for the design of five miles of new urban roadway, utilities, and stormwater infrastructure to support future mixed-use residential development on a 75-acre redevelopment parcel. Royal Caribbean Cape Liberty Cruise Terminal, Bayonne, NJ – Site/civil engineering lead responsible for the design of the site and supporting infrastructure for the new Royal Caribbean cruise terminal at the MOTBY site. Responsibilities included extensive coordination with Royal Caribbean and the Porty Authority of New York & New Jersey, as well as site circulation, passenger and bus queuing and parking design, stormwater and utilities, bollard and mooring layout, and permitting.