Packet · Nov 12, 2024
Township Council Meeting — Packet
7a1def62c31c151b6c4bb4838998e5f15a5f59d5e0238037444733552be335adIndexed text · page 129
Show all pages Any pavement cores, temporary or permanent wells, test pits, or test strips, if and as warranted or required County or local planning board submissions are excluded Traffic engineering is excluded Preparation of a Phase I Environmental Site Assessment (ESA) is excluded Structural engineering shall be limited to light pole and shade structure foundations and calculations CLOSING Any item listed above which is not ordered will not be billed. Separate authorization from the client will be requested prior to commencing services outside the scope of this proposal. All out-of-pocket expenses including, but not limited to, application fees, laboratory testing costs, mylar copies, certified mailings, photographs, blueprints, and special deliveries are considered additional to the proposal items unless specifically noted within the scope of this proposal. This proposal is submitted solely and exclusively for the use of the Township of West Orange for consideration of the professional services of Matrix. Disclosure of this proposal’s content to any third party without prior written authorization from Matrix is expressly prohibited. In addition to the specific items as listed herein, the client may be required to demonstrate compliance with certain permit and approval conditions as may be imposed by one or more of the regulatory agencies. These conditions may require revisions to the plans and/or preparation of additional supporting documentation. This proposal does not include these additional items unless specifically outlined within the scope of this proposal. 10
File revisions (1)
- Sep 29, 2026
7a1def62c31c11,584,340 bytes