Town CrierWest Orange, New Jersey
← Back to search

Packet · Nov 25, 2024

Township Council Meeting — Packet

Preserved file SHA-2562e96ec8240f722ba48013393d4787a1405d283f925366b0f0b8e5ce974c17182

Indexed text

Page 33

CRYSTAL LAKE

Page 34

CRYSTAL LAKE

Page 35

CRYSTAL LAKE wy =x s Co) z a ra 2 a a 6 a

Page 36

CRYSTAL LAKE STONE DUST PATH AND PAVERS AREA BY LAKE

Page 37

Brandon Santos From: Sent: To: Cc: Subject: Zayibeth Carballo Tuesday, October 22, 2024 9:22 AM Taylor, Trevor gvalesi@cmeusa1.com; Hess, John; Brandon Santos; Glenn McCarthy RE: RFP-WEST ORANGE OSPAC & CRYSTAL LAKE IMPROVEMENTS Importance: High Below please find ques ons and answer to the RFP: A. Regarding the OSPAC work 1. I can’t make out the amphitheater from Google Earth. Do you have a sound system picked out so we can understand the extent/intent? Is it an amplifier and a pair of speakers that sit on the stage or is it an amplifier, mul ple speaker banks and a sound board to control sound quality? Hard wired or wireless? Is there power already at the amphitheater? OSPAC already has the sound system and for what I had gather from the Recrea on Director all they need is a pair of speaker up on the stage. 2. How many bleachers and where? Is there an accessible route to the bleacher loca ons or will that need to be created as part of the scope? According to the Recrea on Director, they are actually looking for stadium seats and approximately 3 rows for people to seat in front of the stage. An accessible route will need to be created. 3. Are the pathway lights for the full 0.5 mile pathway? Yes. Have they been picked out yet? No. Where will power for the path lights be coming from. I will assume a power source will be needed or from a u lity pole nearby. 4. Is the entrance sign is something like the one I did at Li le Falls (See a ached)? If not, please clarify. Where will power come from? Maybe. I’m not sure. B. Regarding “Other Possible Ameni es” 1. How is the fee to be presented for this work? Show it be as an alternate so is can be easily added to or removed from the scope? I would recommend presen ng the fee for each sec on and breaking it down so that It can easily be removed or added in the future. 2. Not sure what you mean by “…the construc on of a small shoreline with outdoor showers”? Beach sand and outdoor shower area. 3. Regarding the outdoor showers, where will they go and how will water/sanitary services be provided? U li es will need to be provided from NJAW and PSE&G for electric and gas. 4. What is the scope of the sea ng pavilion area? Basically, what kind of sea ng capacity are you looking for? Is the area already graded flat? The pavilion area will have to be picked but according to Recrea on Director; he was thinking of picnic

Page 37

ea? Basically, what kind of sea ng capacity are you looking for? Is the area already graded flat? The pavilion area will have to be picked but according to Recrea on Director; he was thinking of picnic tables. 5. Regarding the playground, do you have an equipment list? We do not have an equipment list yet. Have you checked equipment lead me on the equipment? No. I was looking into playground equipment a couple years 1

Page 38

ago and I seem to remember the lead me being 10-12 weeks. That was closer to the end of Covid so things may have improved. Not sure. 6. Regarding the concession stand, they can range from a pre-fab wooden shed with coolers for drinks and prepackaged snacks to a masonry building with a commercial kitchen. Can you provide a li le more of a descrip on? Recrea on Director not sure of permanent concession stand. We’re more incline for a food truck area. C. Regarding “Retrofi ng Storm Drains” 1. This sounds like swapping out inlet frames and grates. Is there something else that you have in mind? Things like Manufactured Treatment Devices for water quality come to mind. I was thinking of changing grates, cleaning swales and maybe MTD’s if need it by NJDEP. Zayibeth Carballo, PE,PLS,PP,CME,CFM,CFS Director, Municipal Engineer Department of Engineering Township of West Orange 25 Lakeside Avenue West Orange. NJ 07052 Phone/Fax: (973) 325-4165 zcarballo@westorange.org www.westorange.org  Please consider the environment before you print this email America, Land of the Free, Because of the Brave! C Confiden ality No ce: This e-mail contains informa on from theTownship of West Orange. It is intended only for the person or en ty to which it is addressed and may contain informa on that is privileged, confiden al or otherwise protected from disclosure. Dissemina on, distribu on or copying of this e-mail or the informa on contained within it by anyone other than the intended recipient or an employee or agent responsible for delivering the message to the intended recipient is prohibited. If you have received this e-mail in error, please call 973-325-4100 and destroy the original message and all copies. From: Zayibeth Carballo Sent: Friday, October 11, 2024 6:40 PM To: Taylor, Trevor <trevort@cmeusa1.com> Cc: gvalesi@cmeusa1.com; Hess, John <jhess@cmeusa1.com>; Brandon Santos <bsantos@westorange.org>; Glenn McCarthy <GMcCarthy@westorange.org> Subject: RFP-WEST ORANGE OSPAC & CRYSTAL LAKE IMPROVEMENTS Good evening Trevor, Attached please find RFP for Professional Services. Please response that you have receive request and don’t hesitate to contact us if you have any ques ons 2

Page 39

Zayibeth Carballo, PE,PLS,PP,CME,CFM,CFS Director, Municipal Engineer Department of Engineering Township of West Orange 25 Lakeside Avenue West Orange. NJ 07052 Phone/Fax: (973) 325-4165 zcarballo@westorange.org www.westorange.org  Please consider the environment before you print this email America, Land of the Free, Because of the Brave! C Confiden ality No ce: This e-mail contains informa on from theTownship of West Orange. It is intended only for the person or en ty to which it is addressed and may contain informa on that is privileged, confiden al or otherwise protected from disclosure. Dissemina on, distribu on or copying of this e-mail or the informa on contained within it by anyone other than the intended recipient or an employee or agent responsible for delivering the message to the intended recipient is prohibited. If you have received this e-mail in error, please call 973-325-4100 and destroy the original message and all copies. 3

Page 40

OSKAR SCHINDLER PERFORMING ARTS CENTER AND CRYSTAL LAKE IMPROVEMENTS SUBMITTED TO Township of West Orange Department of Engineering 66 Main Street West Orange, NJ 07052 Attention: Zayibeth Carballo SUBMITTED BY Matrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike, 2nd Floor Florham Park, NJ 07932 P: 973.240.1800 F: 973.240.1818 SUBMITTED DATE October 25, 2024

Page 41

Matrix New World Engineering, Land Surveying and Landscape Architecture, PC 26 Columbia Turnpike, 2nd Floor Florham Park, NJ 07932 973.240.1800 F: 973.240.1818 www.mnwe.com October 25, 2024 Zayibeth Carballo, Municipal Engineer Director of Engineering Township of West Orange 66 Main Street West Orange, NJ 07052 Re: REQUEST FOR PROPOSAL FOR OSKAR SCHINDLER PERFORMING ARTS CENTER (OSPAC) AND CRYSTAL LAKE IMPROVEMENTS Dear members of the selection committee: The OSPAC and Crystal Lake Improvements contract demands a collaborative team with diverse expertise. We have assembled local experts with extensive engineering and consulting experience tailored for public clients. To succeed, the consultant team must be agile in addressing unforeseen conditions and work closely with the Township to deliver safe, detailed, and compliant solutions. Matrix New World Engineering, Land Surveying and Landscape Architecture, PC (Matrix) is a 30-year-old full-service firm providing civil, environmental, environmental, geotechnical, marine, and structural engineering services; hazardous materials services; survey consulting; and landscape architecture expertise. As one of the largest engineering firms in the state, Matrix has long been recognized as a leader in civil engineering and surveying services. The firm brings extensive experience, capability, and knowledge to West Orange’s ever-evolving engineering challenges. Matrix takes a proactive approach in partnering with clients to ensure compliance, mitigate liability, overcome engineering obstacles, enhance infrastructure, and foster a collaborative environment that leads to the most effective solutions for the end user. This proposal presents our team, our deep history of experience delivering civil engineering and surveying services, and our approach to working collaboratively with the Township to deliver the support required. The Matrix team is the right team because of the following key factors:    Experience: With over 25 years of experience with New Jersey public entities, Matrix is extremely knowledgeable in providing professional services to and advising these types of clients. Our firm and staff are well versed in waterfront projects as well as various improvement developments. Management: Our management approach allows us to provide our services in very economical fashion and the team we have assembled will be

File revisions (1)