Packet · Mar 11, 2025
Township Council Meeting — Packet
6356f7ee6266ec7c3d53c9a4c4e0994af304352f45e3902494872d446c1dda2aIndexed text · page 149
Show all pagesSafety Study Devonshire Terrace & Nottingham Road Project No.: 241193 February 4, 2025 Page 6 of 7 STOP Sign Installation – A STOP control on the minor-road approach should be considered as per Section 2B.11-Minor Road Stop Control of the MUTCD (11 th Edition). The STOP sign would provide the appropriate traffic control at the study intersection to improve safety and circulation of traffic. We recommend that the Township install a STOP sign on Nottingham Road at the study intersection. The installation of the STOP sign should be implemented per the guidance presented within Chapter 2B-Regulatory Signs, Barricades, and Gates of the MUTCD (11 th Edition). FIGURE 4 – STOP Sign Installation Striping and Signages – Given the wide curb radius at the study intersection and roadway geometry, we recommend the implementation of additional striping to support the installation of the stop sign. We recommend that the Township provide a stop bar and double yellow line striping on Nottingham Road to support the stop sign. Sidewalk and Crosswalk Markings – We recommend that the Township consider installing sidewalks and marked crosswalks within the study area to improve pedestrian safety and circulation. The implementation of the roadway striping, and signs should follow the guidance presented within the latest edition of the MUTCD. 70 South Orange Avenue, Suite 109 Livingston, New Jersey 07039 C: (732) 236-7557 T: (973) 228-0999 F: (201) 753-3904 BrightViewEngineering.com PO Box 99 Roseland, NJ 07068
File revisions (1)
- Sep 29, 2026
6356f7ee626636,495,837 bytes