• • • • • • • Costs do not include additional borings or test pits if required beyond the scope of work provided above; Costs do not include foundation, slab, or pavement design; Costs do not include Site specific seismic evaluation; Costs do not include preparation of drawings; Costs do not include construction oversight or inspection services; Costs do not include any additional NJDEP notification or reporting fees; and All external costs will be charged at cost plus 15%. We thank you for the opportunity to be of service to you on this project. If you have any questions or require any additional information, do not hesitate to contact me at (973) 240-1800 or at amolnar@mnwe.com. Sincerely, Allison Molnar Project Manager 5