Packet · Mar 25, 2025
Township Council Meeting — Packet
e107f0d41b9990ecfbe0fc745de0e646e23b6c4757a88d66437d9ac0c295720bIndexed text · page 106
Show all pagesAuthorization Down Payment $ 1,700,000 (including the $517,907 DOT Grant) $ 1,182,093 $ 0 10 years (iv) Improvements and repairs to the entire lengths or portions of, as applicable, South Valley Road, Union Street, Nassau Street from South Valley Road to Township limits and Wheatland Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 2,510,000 (including the $950,000 DOT Grant) $ 1,560,000 $ 0 10 years (v) Improvements and repairs to the entire lengths or portions of, as applicable, Helen Avenue, Lawrence Avenue, Florence Place, and Lowell Avenue, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $ 2,000,000 (including the $498,984 DOT Grant) $ 1,501,016 $ 0 10 years Description Appropriation Walker Road, South Valley Road, and Rooney Circle, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; (iii) Improvements and repairs to the entire lengths or portions of, as applicable, Morris Road, Sussex Road and Hunterdon Road, including, but not limited to, as applicable, milling, paving, storm drain installation, curbs, sidewalks, ADA compliant ramps, and driveway aprons; $1,000,000 DOT Grant) Useful Life (vi) Improvements and repairs to the Lando Parking Lot, including, but not limited to, milling, paving, line painting, striping, signage, new curbs, base repair and driveway aprons; $ 425,000 $ 405,000 $ 20,000 10 years (vii) Purchase and installation of calming measures, including, but not limited to, signs, striping and LED high visibility lights along Kelly Drive; $ 75,000 $ 72,000 $ 3,000 7 years (viii) Improvements and repairs to Dogwood Drive at Boland Park including, but not limited to, milling, paving, line painting, striping, signage, new curbs, base repair, and driveway aprons; $ 85,000 $ 81,000 $ 4,000 10 years (ix) Exterior improvements and building and grounds improvements along Rooney Circle; and $ 2,000,000 $ 95,000 15 years 3 #95178364.1 168182.012 $ 1,905,000
File revisions (1)
- Sep 29, 2026
e107f0d41b994,634,902 bytes