Packet · Mar 25, 2025
Township Council Meeting — Packet
e107f0d41b9990ecfbe0fc745de0e646e23b6c4757a88d66437d9ac0c295720bIndexed text · page 59
Show all pagesTask 2 – Survey Findings Summary Labor ..........................................................................................................................................$5,820.00 Total Estimated Cost for Task 2 ..................................................................................$5,820.00 Task 3 – Hazardous Materials Construction Documents Labor ..........................................................................................................................................$5,540.00 Total Estimated Cost for Task 3 ..................................................................................$5,540.00 Task 4 –Concrete Sampling Option 1 Labor ......................................................................................................................................... $6,600.00 Expenses (Analytical, Travel, Equipment, Etc.) ....................................................................... $9,560.00 Total Estimated Cost for Task 4 (Option 1) ...............................................................$16,160.00 Option 2 Labor ......................................................................................................................................... $8,720.00 Expenses (Analytical, Travel, Equipment, Etc.) ..................................................................... $27,780.00 Total Estimated Cost for Task 4 (Option 2) ...............................................................$36,500.00 Task 5 – Concrete Letter Report Labor ..........................................................................................................................................$7,660.00 Total Estimated Cost for Task 5 ...................................................................................$7,660.00 Task 6 – Contract Documents and Bid Support Labor ........................................................................................................................................$16,000.00 Total Estimated Cost for Task 6 .................................................................................$16,000.00 Task 7 – Project Management Labor ..........................................................................................................................................$5,000.00 Total Estimated Cost for Task 7
ect Management Labor ..........................................................................................................................................$5,000.00 Total Estimated Cost for Task 7 ...................................................................................$5,000.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 1............................................$76,900.00 TOTAL ESTIMATED COST FOR SCOPE OF WORK Option 2............................................$97,240.00 Assumptions Based on the current understanding of the proposed project, Matrix has made the following assumptions. • Field work will be subject to the acceptable hours of the facilities. • As the building is in poor condition and scheduled for demolition, Matrix will make limited or no repairs to sampling locations unless it creates a safety hazard. • Matrix may make assumptions to materials that are deemed unsafe for destructive sampling which includes but may not be limited to live electrical equipment, flange gaskets to active pipes and areas not safely accessible (i.e., significantly damaged roof areas). • Matrix does not anticipate the need for ariel lifts or entering permit required confined spaces. F:\2025\25-0037 West Orange DPW\ Proposal\Hazmat\Limited Hazmat Surv ey and demo specs propos al - 25 Lakeside _D PW_FINAL.docx 5
File revisions (1)
- Sep 29, 2026
e107f0d41b994,634,902 bytes