Packet · Mar 25, 2025
Township Council Meeting — Packet
e107f0d41b9990ecfbe0fc745de0e646e23b6c4757a88d66437d9ac0c295720bIndexed text · page 70
Show all pagespathway soil remediation standard. All samples will be submitted on a standard turnaround time. The analytical data package for all samples will be a NJDEP Reduced Deliverables package. The sampling is expected to be completed in two days. All analytical results for concrete will be compared to the NJDEP MGWSRS, the Non-Residential IngestionDermal Exposure Pathway Soil Remediation Standards (NRIDSRS), Non-Residential Inhalation Exposure Pathway Soil Remediation Standards (NRISRS), Residential Ingestion-Dermal Exposure Pathway Soil Remediation Standards (RIDSRS), and the Residential Inhalation Exposure Pathway Soil Remediation Standards (RISRS). TASK 5 – CONCRETE LETTER REPORT Upon completion of the concrete sampling activities, Matrix will summarize the concrete data in table format and the results will be compared to the NJDEP’s soil remediation standards. The letter report will include a site plan depicting the sample locations, analytical summary tables, figures with analytical results summary, and preliminary recommendations. Matrix can also provide an associated cost estimate and estimated timeline for beneficial reuse evaluation or disposal of the concrete, at additional cost. TASK 6 – CONTRACT DOCUMENTS AND BID SUPPORT Matrix will complete a site inspection and prepare project specifications for the building removal. Matrix will coordinate with all utility companies, as required, regarding the shutoff of the existing utilities. It is anticipated that local Soil Conservation District approval will be required for this project. Matrix will prepare the application forms and plans for certification as part of this task; however, this proposal does not include any application fees. The project specifications will include information on soil erosion requirements. The final site will include topsoil and seed restoration. The specifications will be prepared in accordance with the public bidding format. Once specifications are complete Matrix will coordinate with the Township and provide assistance throughout the bidding process. This will include the advertisement of the bid, response to all bidder questions and the review of the bids, and preparation of a recommendation of award to the Township. TASK 7 – PROJECT MANAGEMENT This task includes project management and in anticipation of future conference calls and/or meetings with the project team. As a part of
mendation of award to the Township. TASK 7 – PROJECT MANAGEMENT This task includes project management and in anticipation of future conference calls and/or meetings with the project team. As a part of this task, the Matrix LSRP will oversee the activities outlined above. COSTS All work will be completed in accordance with our terms and conditions (attached). It is proposed that this work will be performed on a time & material not-to-exceed (T&M NTE) basis. The following are our estimated costs for the tasks described herein. Task 1 –Field Sampling, Documentation and Analysis Labor ..................................................................................................................................................... $16,900.00 Expenses (Analytical, Travel, Equipment, Etc.) ................................................................................... $10,955.00 Total Estimated Cost for Task 1 .............................................................................................. $27,855.00 Task 2 – Survey Findings Summary Labor ........................................................................................................................................................ $5,760.00 Total Estimated Cost for Task 2 ................................................................................................ $5,760.00 Task 3 – Hazardous Materials Construction Documents Labor ........................................................................................................................................................ $5,940.00 Total Estimated Cost for Task 3 ................................................................................................ $5,940.00 4
File revisions (1)
- Sep 29, 2026
e107f0d41b994,634,902 bytes