Packet · May 6, 2025
Township Council Meeting — Packet
87663901327ebaaaf6246e00d7581d4eca5deb3609fc0fb6923601f64c174685Indexed text · page 25
Show all pages131-25 DATE: 4/7/25 INVOICE #: 14018 FRANK RIGGI JR. ◆ 21 THIRD STREET RIDGEFIELD PARK, NJ 07660 ◆ FAX: (201) 944 – 4465 RIGGIPAVINGINC@GMAIL.COM ◆ WWW.RIGGIPAVING.COM PLEASE SEND PAYMENT TO: 21 Third Street Ridgefield Park, NJ 07660 BILL TO: Township of West Orange 25 Lakeside Ave. West Orange, NJ 07052 Attn: Jim Williams DESCRIPTION AMOUNT 1. Asphalt Pave Paver Block Area: A. Approximately 7,000 sq. ft. (Jim William’s measurements). B. Remove and dispose of existing paver block. C. Fine grade area and compact. D. Install 4” stabilize base asphalt to entire area (19.5 m64). E. Install 2” compacted 9.5 m64 surface coarse asphalt to entire area. $68,975.00 2. Asphalt Pave Walkway behind Curb: A. Approximately 1,095 sq. ft. and re-route part of path. B. Remove and dispose of existing walkway. C. Re-route part of path due to handicap space added. D. Install additional stone base to entire area and compact. E. Install 2” compacted I-5 surface coarse asphalt to entire area. $7,500.00 3. Reconfigure Handicap Area: A. Dig out soil and grade on site. B. Install 6” compacted stone base to area. C. Install 4” compacted 19m64 base asphalt to area. D. Install 2” compacted 9.5 m64 surface coarse asphalt to area. $2,900.00 4. Stripe Area as Shown. $2,400.00 NJ Sales Tax (6.625%) JOB LOCATION: Boland Park $0.00 TOTAL: $81,775.00 Thank you, we appreciate your business! PAYMENT TERMS: upon receipt A finance charge of 1.5% per month will be added on all accounts overdue 30 days. DEPOSIT: $0.00 BALANCE DUE: $81,775.00
File revisions (1)
- Sep 29, 2026
87663901327e11,280,155 bytes